Skip to Content

Early production draft.andrew@ineng.ca with comments, or request a PDF copy to review.

INEAS SD-100 Site Development Standard

INEAS SD-100:26. Site development: site plan control, grading and drainage, stormwater management, site servicing, and erosion and sediment control.

First edition. Preliminary. Peer review welcome.

Status and legal notice

This Standard is a practice standard prepared by INEAS. It sets the minimum level of practice for site development work prepared by IN Engineering + Planning and, where they engage it, IN Design + Construction and Kingstead Micro-Estates.

This Standard does not have the force of law. Where an approval authority (municipality, conservation authority, Ministry of Transportation, Ministry of the Environment, Conservation and Parks, or a county or region) publishes its own requirement, that requirement governs and this Standard fills the gaps.

Nothing in this Standard makes INEAS the Engineer of Record. Every drawing, calculation and report prepared to this Standard is a draft until it is reviewed, sealed and signed by a licensed professional who accepts responsibility for it.

This Standard is laid out in the manner of a Canadian national technical standard (clause numbering, mandatory language, normative and informative annexes). It is not a CSA Group publication and is not endorsed by CSA Group.

Technical committee

Role

Responsibility on this Standard

President and Principal Engineer

Chair; approves each edition

Senior civil engineer (water resources)

Clauses 6, 7, 9

Senior civil engineer (municipal servicing)

Clause 8

Registered Professional Planner

Clause 5

Project manager (site plan)

Field feedback

AI-assisted office manager

Secretary: data mining, change log, draft amendments. Non-voting

Preface

This is the first edition of INEAS SD-100. It was prepared because no single municipal standard covers site plan engineering in Eastern Ontario, and each municipality, conservation authority and ministry asks for the same work in a different way.

The requirements were derived from INEAS review of municipal standards, published guidance, and review comments on site plan and engineering submissions in Ontario.

A requirement was written as a "shall" where at least one of these held: it is a statutory requirement, it appears in the published standards of several municipalities, or INEAS received it as a deficiency comment more than once.

This Standard is reviewed quarterly against new deficiency comments and changes to provincial law, and reissued annually. Proposed changes are invited through peer review.

This Standard contains technical requirements only. How INEAS applies it on projects (intake, submissions, checklists, reviews, construction administration) is set out in a separate companion manual, which is not part of this publication.

Note: Ontario's site plan control regime is changing. The Province consulted in April and May 2026 on further reforms to site plan control (ERO 026-0310). Clause 5 shall be checked against the enacted law before each edition.

0 Introduction

0.1 Purpose

This Standard gives INEAS one way to plan, design, document and certify site development, whatever the municipality. Its aim is a complete first submission that an approval authority can accept without repeat comments.

0.2 Basis

Most deficiencies INEAS and other applicants receive are not design errors. They are missing items, inconsistent numbers between report and drawing, uncited criteria, and criteria confirmed too late. This Standard therefore puts as much weight on confirming criteria, documenting them, and cross-checking the package as on design rules.

0.3 Order of precedence

Where requirements conflict, the higher item governs:

  1. Statute and regulation (Planning Act, Ontario Water Resources Act, Conservation Authorities Act, Building Code Act and the Ontario Building Code, Public Transportation and Highway Improvement Act, Drainage Act, Clean Water Act)
  2. Conditions of an approval, permit, agreement or Environmental Compliance Approval
  3. The approval authority's current published standards, guidelines and pre-consultation direction
  4. The conservation authority's and watershed plan's criteria
  5. Provincial guidance (MECP, MTO)
  6. This Standard
  7. Other Canadian standards, then US standards, then European standards as alternative solutions

0.4 How to use this Standard

Clauses 4 to 11 set technical requirements. Annex A is informative and lists municipal variations. Procedures, checklists, drawing content, report outlines and the technical review process are in a separate companion manual.

1 Scope

1.1 Inclusions

This Standard applies to engineering and planning work by INEAS for development in Ontario that needs one or more of the following:

  1. a site plan approval under section 41 of the Planning Act, or an exemption from it;
  2. a grading and drainage plan for a building permit, lot grading approval, consent, minor variance or conservation authority permit;
  3. a stormwater management report or brief;
  4. a site servicing plan or functional servicing report, including private well and septic servicing;
  5. an erosion and sediment control plan; or
  6. engineering review of the above prepared by others.

1.2 Exclusions

This Standard does not cover:

  1. design of municipal infrastructure intended for assumption (roads, trunk sewers, watermains, municipal SWM ponds), except connections to it;
  2. plans of subdivision, except the lot-level and block-level items that also apply to site plans;
  3. building design under the Ontario Building Code, except where site works affect it (foundation elevations, fire access, plumbing connections);
  4. traffic impact studies, noise studies, environmental impact studies and Phase One or Two ESAs, except how their findings are carried into the civil drawings; and
  5. landscape architecture, except coordination with grading and servicing.

1.3 Terminology

In this Standard, "shall" is a mandatory requirement; "should" is a recommendation; "may" is an option; and "can" is a possibility or capability.

Notes accompanying clauses are informative and do not add requirements. Notes to tables and figures are normative unless stated otherwise.

Values marked "INEAS default" apply only where the approval authority has no criterion of its own. Values marked [To be confirmed] have not yet been confirmed by the technical committee and shall not be used until they are.

1.4 Units

All values are in SI units. Elevations are geodetic in metres.

2 Reference publications

This Standard refers to the following publications. Where a reference is undated, the latest edition, including all amendments, applies. Edition years shown shall be rechecked before each project.

2.1 Ontario statutes and regulations

Reference

Title / subject

R.S.O. 1990, c. P.13

Planning Act, including s. 41 (site plan control)

O. Reg. 254/23

Prescribed areas, s. 41 of the Planning Act (residential developments of 10 or fewer units)

O. Reg. 10/26

Site plan control: professional engineering prescribed under s. 41(3.5.1)

Provincial Planning Statement, 2024

Including Chapter 5 (natural and human-made hazards)

R.S.O. 1990, c. O.40

Ontario Water Resources Act, s. 53 (sewage works)

O. Reg. 525/98

Approval exemptions (OWRA)

R.S.O. 1990, c. C.27 and O. Reg. 41/24

Conservation Authorities Act; prohibited activities, exemptions and permits

S.O. 1992, c. 23 and O. Reg. 163/24

Building Code Act; Ontario Building Code (2024), incl. Part 7 and Part 8

R.S.O. 1990, c. P.50

Public Transportation and Highway Improvement Act (MTO permit control areas)

R.S.O. 1990, c. D.17

Drainage Act (municipal drains)

S.O. 2006, c. 22

Clean Water Act (source protection)

O. Reg. 406/19

On-site and excess soil management

O. Reg. 153/04

Records of site condition

O. Reg. 191/11

Integrated Accessibility Standards (Design of Public Spaces)

2.2 Provincial guidance

Reference

Title

MOE (2003)

Stormwater Management Planning and Design Manual

MECP (2022, draft)

Low Impact Development Stormwater Management Guidance Manual (not finalized; use as guidance only)

MOE (2008)

Design Guidelines for Sewage Works

MOE (2008)

Design Guidelines for Drinking-Water Systems

MECP Procedures D-5-4 and D-5-5

Individual on-site sewage systems; private wells (water supply assessment)

MTO (1997)

Drainage Management Manual

MTO

IDF Curve Lookup

MOE Guideline B-6

Erosion and sediment control (where a municipality cites it)

2.3 Canadian standards

Reference

Title

CSA W200:26

Design and construction of bioretention systems and rain gardens

CAN/CSA-W202-18 (R2023)

Erosion and sediment control inspection and monitoring

CSA W204:19

Flood resilient design of new residential communities

CSA W211:21

Management standard for stormwater systems

CSA PLUS 4013:19

Technical guide: Development, interpretation and use of rainfall IDF information

OPSS.MUNI 180

Management of excess materials

OPSS.MUNI 805

Temporary erosion and sediment control measures

OPSD (current)

Ontario Provincial Standard Drawings, incl. 219, 350, 400, 401, 1003 and 1109 series

Fire Underwriters Survey (2020)

Water Supply for Public Fire Protection

TAC (2017, as updated)

Geometric Design Guide for Canadian Roads

ISO 14034

Environmental Technology Verification (manufactured treatment devices)

2.4 Conservation authority and regional guidance (informative)

TRCA and CVC, Low Impact Development Stormwater Management Planning and Design Guide (Sustainable Technologies wiki); TRCA Erosion and Sediment Control Guide for Urban Construction (2019); Cataraqui Conservation Guidelines for Stormwater Management; RVCA, MVCA and South Nation Conservation development policies; municipal engineering standards.

2.5 Additional references

Edition years below shall be rechecked against the publisher's current edition before issue.

Local municipal and conservation authority (priority 1)

  • Brockville: Site Plan Control Manual: Requirements and Guidelines; Application for Site Plan Control, Residential Development (By-law 039-2012 pre-consultation); Residential Lot Grading and Drainage Requirements (posted 20 Mar 2025).
  • Cataraqui Conservation (CRCA): Guidelines for Stormwater Management; Service Delivery Procedures for Plan Review (Rev. 1, June 2018); Appendix D, Guidelines for Geotechnical Investigation (April 2015); 2026 plan review fee schedule.
  • Kingston: Site Plan Control Guidelines (Feb 2025); Site Plan Control By-law 2025-109 (replaces By-law 2010-217).
  • Leeds and Grenville area: Augusta, Application for Site Plan Control and By-law 2778-2009; Edwardsburgh Cardinal, SPC Application Review Process (30 Mar 2023) and fillable application with Appendices A to I; Gananoque, Development Permit By-law 2010-65; Front of Yonge, Planning Application package Appendix A; North Grenville, Engineering Standards Sections A and C (Aug 2022).

Large municipal (priority 2)

  • City of Ottawa: Sewer Design Guidelines SDG 004, Fourth Edition (Dec 2025), chapter 8 and Appendix 10; Site Plan Terms of Reference (Dec 2024); Grading and Drainage Plan Terms of Reference; Site Servicing Study Terms of Reference; Servicing Study Guidelines and checklist.
  • City of Hamilton: Development Application Guidelines, Stormwater Management Report/Plan (updated 13 Feb 2026); Functional Servicing Report guideline.
  • City of Brantford: Design and Construction Manual, Storm Sewers (Linear), V7 (Feb 2023).
  • Town of Oakville: Development Engineering Procedures and Guidelines Manual; Stormwater Management Study/Report terms of reference.
  • Regional Municipality of Peel: Stormwater Design Criteria (June 2019); Stormwater Management Report Requirements (Dec 2022).

Ontario and provincial (priority 3)

  • O. Reg. 235/25 (amending O. Reg. 406/19, on-site and excess soil management).
  • MTO Highway Drainage Design Standards (Nov 2023), SD-1, SD-4, SD-9, SW-1, SW-2, SW-3, WC-7 and WC-8.
  • Ontario Building Code 2024 (O. Reg. 163/24, in force 1 January 2025), being NBC 2020 as amended by the Ontario Amendments document dated 8 October 2024 (O. Reg. 447/24).
  • MNRF (1996), Technical Guide for Great Lakes and St. Lawrence River Shorelines; Atria Engineering (1997), Wave Uprush and Overtopping: Methodologies and Applications, Great Lakes and St. Lawrence River System.

Canadian standards (priority 4)

  • CSA Z800-18, Basement flood protection (cited in Clause 11).
  • CSA A23.1 and CSA A23.3 (concrete design and materials, Canadian edition; governs over ACI where the OBC applies).
  • CSA S6:19, Canadian Highway Bridge Design Code (not a building-load reference).

United States standards (priority 5, informative only)

  • ACI 318 (structural concrete), ACI 360R-10 (slabs-on-ground), ACI 302.1R-15 (floor and slab construction).
  • ASCE 7-22 (supersedes ASCE 7-16 for loads).
  • ASCE/SEI 24 (flood-resistant design and construction), FEMA P-936 (floodproofing non-residential buildings).
  • USACE Coastal Engineering Manual, Part VI (wave runup and overtopping), and the Ahrens and McCartney (1975), Stoa (1979), Losada and Gimenez-Curto (1981), Ahrens and Heimbaugh (1988), and Van der Meer and Stam (1992) papers used in Clause 11.1.6.
  • NRC (2021), Guide for Design of Flood-Resistant Buildings (Coulbourne et al.).

3 Definitions and abbreviations

3.1 Definitions

The following definitions apply in this Standard.

Approval authority: the municipality, upper-tier municipality, conservation authority, ministry or road authority whose approval, permit or acceptance the work needs.

Allowable release rate: the maximum peak discharge from a site to an outlet for a stated design storm, set by the approval authority or, where none is set, by Clause 7.4.

Comment-response matrix: a numbered table that restates each review comment and gives the specific change made and where it is shown.

Emergency overland flow route: the surface path that carries flows above the major-system design storm, or flows when a control fails, to a safe outlet.

Finished floor elevation (FFE): the geodetic elevation of the top of the lowest floor slab at grade.

Hydraulic grade line (HGL): the elevation of water in a sewer system under a stated design storm, including surcharge.

Inlet control device (ICD): an orifice, plug, plate, tube or vortex device that limits discharge from a storage element.

Low impact development (LID): source and conveyance controls that retain, infiltrate, evapotranspire or reuse runoff close to where it falls.

Major system: surface flow paths, including roads, swales and ponding areas, that carry runoff above minor-system capacity.

Minor system: pipes, catch basins, ditches and culverts sized for the minor design storm.

Oil-grit separator (OGS): a manufactured treatment device that removes sediment and floatables by settling and separation.

Pre-consultation record: the written list of required plans, studies and criteria issued by the approval authority before an application.

Qualified person: a person licensed or certified to prepare and seal the work in question: P.Eng. for engineering; OLS for surveys; OALA for landscape plans; RPP for planning justification; P.Geo. or P.Eng. for hydrogeology.

Seasonally high groundwater: the highest groundwater level expected during the year, based on monitoring through the spring freshet or a justified correction.

Underside of footing (USF): the geodetic elevation of the bottom of the lowest footing.

3.2 Abbreviations

Abbreviation

Meaning

ADD / MDD / PHD

Average day / maximum day / peak hour demand

CA

Conservation authority

CLI-ECA

Consolidated Linear Infrastructure Environmental Compliance Approval

EASR

Environmental Activity and Sector Registry

ECA

Environmental Compliance Approval

ESC

Erosion and sediment control

FDC

Fire department connection

FSR

Functional servicing report

IDF

Intensity-duration-frequency

MECP

Ministry of the Environment, Conservation and Parks

MRM

Modified Rational Method

MTO

Ministry of Transportation

OBC

Ontario Building Code

OPSD / OPSS

Ontario Provincial Standard Drawings / Specifications

PTTW

Permit to Take Water

ROW

Right-of-way

SWM

Stormwater management

Tc

Time of concentration

TF

Top of foundation

TSS

Total suspended solids