Annex A (informative) — Municipal variations, Eastern Ontario

The criteria below override the INEAS defaults where they apply. They are taken from the municipal publications listed in this Annex, and shall be rechecked against the authority's current document on every project.

Authority

Document (edition)

Key site engineering criteria

City of Brockville

Residential Lot Grading and Drainage Requirements (posted Mar 2025); SPC manual

1:200 metric; geodetic benchmark; min 2% surface slope; max 3:1; swales 150 mm deep (200 mm on rear lot lines); max 300 mm ponding; no increase over pre-development; final grading tolerance 50 mm; Tc min 15 min; cite OPSS.MUNI 805 and 180 in notes

City of Kingston

Site Plan Control Guidelines (Feb 2025); CLI-ECA SWM Checklist (V3, May 2023)

Submissions through DASH; existing grades 3 m and 6 m beyond site; post not above pre to 100-year (80% of pre where capacity is limited); Tc min 15 min; City IDF for 5-year, Environment Canada IDF to 100-year; lawn C = 0.25; CRCA consent for CLI-ECA

Cataraqui Conservation

Guidelines for Stormwater Management

Control to the 2-year pre-development rate; LID screening section; ICD and OGS calcs with first submission; 0.3 m pond freeboard

United Counties of Leeds and Grenville

County entrance policy

Drainage memo or study for sites fronting County roads; entrance permit

Township of Leeds and the Thousand Islands

Site Plan Control Guidelines

Pre-consultation mandatory; geodetic datum and Township benchmark; retaining walls over 1.0 m P.Eng.-certified; securities 50% on-site, 100% on municipal land

Municipality of North Grenville

Engineering Standards, Sections A and C (Aug 2022)

600 x 900 mm sheets; post to pre for 5- and 100-year; quality event 25 mm 4-hour or 2-year; LID first; MTO IDF; 100-year HGL 0.3 m below USF; min restrictor 100 mm; inspection MH within 1.5 m of property line (E4.07); live-tap note (D5.05)

City of Cornwall

Site Plan Process Submission Requirements (2016)

1:500 or larger; minor system 5-year; post to pre for 100-year; 70% TSS (urban, larger sites); ditch slopes max 3:1; frost cover 2.0 m

Township of South Stormont

Site Plan & Subdivision Design Guidelines (Sept 2022)

NAD83 geodetic; grading max 1:500 with 3 benchmarks; post to pre for 5/100-year (Cornwall IDF); 70% TSS

United Counties of SDG

Engineering Design Standards (Dec 2023)

Post to pre for 5/100-year; 80% TSS; Rational Method under 5 ha; ponding max 300 mm; 300 mm freeboard

Town of Perth

Engineering Design Guidelines

Minor system to 5-year; 100-year major flow max 300 mm deep; release capped at 5-year pre rate; rooftop storage max 100 mm

Town of Smiths Falls

SPC By-law Appendix A (2021)

Grading plan for new buildings or parking over 4 spaces; spot elevations 5 m onto abutting land; post not above pre; 5/100-year ponding shown; maximize infiltration

City of Ottawa

Sewer Design Guidelines SDG 004 (4th ed., Dec 2025); Grading and Drainage ToR

Existing elevations 10 m into adjacent lands; LID screening per Appendix 10; grassed slopes max 7%; watermain cover 2.4 m; city standard details over OPSD

Town of Hawkesbury

Design Guidelines for Municipal Infrastructure (Rev 2, 2019)

Rational Method with Ottawa IDF, min Tc 10 min; watermain min 150 mm, 2.4 m cover; hydrants max 90 m; storm min 250 mm; no foundation drains to sanitary

MTO

Drainage Management Manual; corridor management

No increase to highway ditch; MTO IDF; per-outlet analysis; no reliance on rooftop storage or orifice plates for flows to MTO; permit control limits plotted

A.2 Local additions

These additions are summaries of municipal publications and shall be checked against the current municipal document.

  • City of Brockville: Site Plan Control Manual. Drawings at least 1:250 unless the City agrees otherwise in writing. Imperial drawings are not accepted. The legend shows zoning, OBC data, landscaped and paved areas in m2 and %. Grading and drainage plans include detention calculations. Pre-consultation is mandatory under By-law 039-2012. The residential application package is 8 collated 24x36 sets, 1 set at 11x17, a PDF, and one paper and one digital copy of each study.

  • Cataraqui Conservation (CRCA): Plan review of site plans and technical reports. Site plan comments test conformity with the subwatershed and master drainage plans. Post-development flow to the 2-year pre-development rate in the Cataraqui watershed. Geotechnical reports for erosion hazard sites use a stable slope allowance of 3H:1V in till (1H:1V in bedrock) plus a 6 m erosion access allowance.

  • City of Kingston: Site Plan Control Guidelines (Feb 2025). Metric drawings with revision blocks. Grading plans show existing grades 3 m and 6 m beyond the site. Submissions only through DASH. By-law 2025-109 applies citywide, with exemptions for lots of 10 or fewer residential units.

  • Township of Augusta: Site plan control area by By-law 2778-2009. Application must show a 15 m shoreline buffer, wells, septic, floodplain and Leda clay. Agreement securities are cash or an irrevocable letter of credit before execution.

  • Township of Edwardsburgh Cardinal: Engineer plans sealed by an Ontario P.Eng. Grading plans show geodetic elevations and pre- and post-development flows where drainage reaches a road. Servicing frost protection is required under 1.5 m of cover. Landscape screening of at least 1.2 m conifers.

  • Town of Gananoque: Development Permit System (By-law 2010-65). One application covers site plan, minor variance and zoning. Classes I to III. Completeness is confirmed within 10 working days. Securities cover 100% of on-site and off-site works.

  • City of Ottawa: Grading and Drainage Plan Terms of Reference. Existing elevations 10 m into adjacent lands. Title block includes a revision box. Flow arrows, ponding limits and overland routes are shown. Servicing study types are Comprehensive, Assessment of Adequacy, Functional, and SWM report or Detailed Design Brief.

  • City of Hamilton: Stormwater Management Report guideline (13 Feb 2026). Ponding limited to 0.25 m in parking lots and 0.30 m in loading bays. Report needs digital model files, catchment shapefiles and a 67-item checklist.

  • City of Brantford: Storm sewer design manual (V7, Feb 2023). Minor system 5-year, major 100-year. Enhanced quality of 80% TSS. Erosion control by 25 mm 4-hour extended detention.

  • Region of Peel: Stormwater design criteria (June 2019). Drainage onto Regional roads is not permitted.

Annex B (informative) — Basis: most-cited requirements and repeat review themes

B.1 Requirements most often published by Ontario municipalities

Count = number of municipal publications reviewed that state the requirement.

Requirement

Count

Clause

Seal, sign and date all engineering drawings and reports

97

4.1.1

Tie elevations to a geodetic benchmark shown on the grading plan

71

4.2.2

Standard metric scale, same across sheets

71

4.2.1

Metric units only

65

4.2.1

Vector, flattened, unlocked PDFs

63

Clause 1.3 (submission format)

SWM report or brief to the municipal terms of reference

61

7.1

Pre-consultation before submission; record attached

56

3.1 (pre-consultation record)

Georeferenced CAD files where required

56

4.2.3

Design to current municipal standards; deviations accepted in writing

55

4.2.3; 4.4.1

Current OLS boundary and topographic survey as base

51

4.2.4

Site or functional servicing report

48

8.1.1

ESC plan sealed by a P.Eng.

40

9.1

Post-development peaks controlled to pre-development or allowable rate

37

7.4.1

B.2 Repeat review themes

The themes below are generalised from recurring review comments on engineering submissions. They drove the clauses shown. No counts or project references are given, and authorities are not named.

Repeat theme

Clause

Report, appendices and drawings inconsistent; missing appendices; template text left in

Clause 0.2; Section 4 (Response matrix)

Criteria not confirmed, or another municipality's thresholds cited instead of the governing ones

4.3, 7.1.2

Storage sized with Tc instead of critical duration; method not stated

7.2.3

C values and Tc method unjustified; areas estimated rather than measured in CAD

7.2.4, 7.2.5

Pre-development impervious area unsupported

7.2.6

No per-outlet table; flow to MTO ditch not separated

7.4.2

ICD and OGS calculations missing or devices not labelled on drawings

7.5.3, 7.8.1

No stage-storage-discharge tables or outlet details

7.8.3

LID used without testing, screening or pre-treatment

7.7

Overland flow route shown only in the report, not on the grading plan

6.5.1

Interim vs ultimate connections not shown where a road reconstruction is planned

4.3.3, 8.7

Inspection manhole, curb stop and isolation valve locations

8.2.4, 8.3.2

Generic cover note instead of local frost cover

8.5.2

Septic records and Part 8 capacity not checked on rural additions

8.6

Conservation authority flood level and regulation limit not plotted

6.3.4, 6.6

No ESC drawing with the SWM brief

9.1, 9.3

Site alteration before SWM acceptance

9.5

Annex D (informative) — Open items for peer review

The following items shall be resolved before this Standard is issued. Reviewers are invited to comment in the Response column. Each item needs a decision by the principal engineer.

No.

Clause

Open item

Response

D1

6.4, Table 6.1

Resolved: minimum paved slope 1.5%

D2

6.4, Table 6.1

Resolved: minimum swale slope 2.0%

D3

6.4, Table 6.1

Resolved: driveway 2% to 10%; authority limit near the ROW governs

D4

6.5.2

Confirm freeboard from 100-year spill elevation to lowest opening (proposed 0.30 m)

D5

7.3.1

Set the climate change stress-test increase for 100-year intensity

D6

7.8.2

Confirm default minimum orifice size (proposed 75 mm)

D7

5

Recheck site plan control law after the outcome of ERO 026-0310 and the 2026 amendments to s. 41

D8

Annex A

Add criteria for Gananoque, Prescott, Elizabethtown-Kitley, Augusta, Rideau Lakes, and RVCA, MVCA and South Nation Conservation as their documents are reviewed

D9

7.14

Confirm every value in Clause 7.14 against SDG 004 (December 2025) and bulletin ISTB-2018-01