Site development: Site plan control, grading and drainage, stormwater management, site servicing, erosion and sediment control, and flood hazard and structural floodproofing

First edition · Preliminary draft · November 2026 · Live working copy, last updated 26 November 2026

Laid out in the manner of a Canadian national technical standard. Not a CSA Group publication and not endorsed by CSA Group. This Standard does not have the force of law.

Contents

Tables

Status and legal notice

This Standard is a practice standard prepared by INEAS. It sets the minimum level of practice for site development work prepared by IN Engineering + Planning and, where they engage it, IN Design + Construction and Kingstead Micro-Estates.

This Standard does not have the force of law. Where an approval authority (municipality, conservation authority, Ministry of Transportation, Ministry of the Environment, Conservation and Parks, or a county or region) publishes its own requirement, that requirement governs and this Standard fills the gaps.

Nothing in this Standard makes INEAS the Engineer of Record. Every drawing, calculation and report prepared to this Standard is a draft until it is reviewed, sealed and signed by a licensed professional who accepts responsibility for it.

This Standard is laid out in the manner of a Canadian national technical standard (clause numbering, mandatory language, normative and informative annexes). It is not a CSA Group publication and is not endorsed by CSA Group.

Technical committee

Role

Responsibility on this Standard

President and Principal Engineer

Chair; approves each edition

Senior civil engineer (water resources)

Clauses 6, 7, 9

Senior civil engineer (municipal servicing)

Clause 8

Registered Professional Planner

Clause 5

Project manager (site plan)

Field feedback

AI-assisted office manager

Secretary: data mining, change log, draft amendments. Non-voting

Preface

This is the first edition of INEAS SD-100. It was prepared because no single municipal standard covers site plan engineering in Eastern Ontario, and each municipality, conservation authority and ministry asks for the same work in a different way.

The requirements were derived from INEAS review of municipal standards, published guidance, and review comments on site plan and engineering submissions in Ontario.

A requirement was written as a "shall" where at least one of these held: it is a statutory requirement, it appears in the published standards of several municipalities, or INEAS received it as a deficiency comment more than once.

This Standard is reviewed quarterly against new deficiency comments and changes to provincial law, and reissued annually. Proposed changes are invited through peer review.

This Standard contains technical requirements only. How INEAS applies it on projects (intake, submissions, checklists, reviews, construction administration) is set out in a separate companion manual, which is not part of this publication.

Note: Ontario's site plan control regime is changing. The Province consulted in April and May 2026 on further reforms to site plan control (ERO 026-0310). Clause 5 shall be checked against the enacted law before each edition.

0 Introduction

0.1 Purpose

This Standard gives INEAS one way to plan, design, document and certify site development, whatever the municipality. Its aim is a complete first submission that an approval authority can accept without repeat comments.

0.2 Basis

Most deficiencies INEAS and other applicants receive are not design errors. They are missing items, inconsistent numbers between report and drawing, uncited criteria, and criteria confirmed too late. This Standard therefore puts as much weight on confirming criteria, documenting them, and cross-checking the package as on design rules.

0.3 Order of precedence

Where requirements conflict, the higher item governs:

  1. Statute and regulation (Planning Act, Ontario Water Resources Act, Conservation Authorities Act, Building Code Act and the Ontario Building Code, Public Transportation and Highway Improvement Act, Drainage Act, Clean Water Act)
  2. Conditions of an approval, permit, agreement or Environmental Compliance Approval
  3. The approval authority's current published standards, guidelines and pre-consultation direction
  4. The conservation authority's and watershed plan's criteria
  5. Provincial guidance (MECP, MTO)
  6. This Standard
  7. Other Canadian standards, then US standards, then European standards as alternative solutions

0.4 How to use this Standard

Clauses 4 to 11 set technical requirements. Annex A is informative and lists municipal variations. Procedures, checklists, drawing content, report outlines and the technical review process are in a separate companion manual.

1 Scope

1.1 Inclusions

This Standard applies to engineering and planning work by INEAS for development in Ontario that needs one or more of the following:

  1. a site plan approval under section 41 of the Planning Act, or an exemption from it;
  2. a grading and drainage plan for a building permit, lot grading approval, consent, minor variance or conservation authority permit;
  3. a stormwater management report or brief;
  4. a site servicing plan or functional servicing report, including private well and septic servicing;
  5. an erosion and sediment control plan; or
  6. engineering review of the above prepared by others.

1.2 Exclusions

This Standard does not cover:

  1. design of municipal infrastructure intended for assumption (roads, trunk sewers, watermains, municipal SWM ponds), except connections to it;
  2. plans of subdivision, except the lot-level and block-level items that also apply to site plans;
  3. building design under the Ontario Building Code, except where site works affect it (foundation elevations, fire access, plumbing connections);
  4. traffic impact studies, noise studies, environmental impact studies and Phase One or Two ESAs, except how their findings are carried into the civil drawings; and
  5. landscape architecture, except coordination with grading and servicing.

1.3 Terminology

In this Standard, "shall" is a mandatory requirement; "should" is a recommendation; "may" is an option; and "can" is a possibility or capability.

Notes accompanying clauses are informative and do not add requirements. Notes to tables and figures are normative unless stated otherwise.

Values marked "INEAS default" apply only where the approval authority has no criterion of its own. Values marked [To be confirmed] have not yet been confirmed by the technical committee and shall not be used until they are.

1.4 Units

All values are in SI units. Elevations are geodetic in metres.

2 Reference publications

This Standard refers to the following publications. Where a reference is undated, the latest edition, including all amendments, applies. Edition years shown shall be rechecked before each project.

2.1 Ontario statutes and regulations

Reference

Title / subject

R.S.O. 1990, c. P.13

Planning Act, including s. 41 (site plan control)

O. Reg. 254/23

Prescribed areas, s. 41 of the Planning Act (residential developments of 10 or fewer units)

O. Reg. 10/26

Site plan control: professional engineering prescribed under s. 41(3.5.1)

Provincial Planning Statement, 2024

Including Chapter 5 (natural and human-made hazards)

R.S.O. 1990, c. O.40

Ontario Water Resources Act, s. 53 (sewage works)

O. Reg. 525/98

Approval exemptions (OWRA)

R.S.O. 1990, c. C.27 and O. Reg. 41/24

Conservation Authorities Act; prohibited activities, exemptions and permits

S.O. 1992, c. 23 and O. Reg. 163/24

Building Code Act; Ontario Building Code (2024), incl. Part 7 and Part 8

R.S.O. 1990, c. P.50

Public Transportation and Highway Improvement Act (MTO permit control areas)

R.S.O. 1990, c. D.17

Drainage Act (municipal drains)

S.O. 2006, c. 22

Clean Water Act (source protection)

O. Reg. 406/19

On-site and excess soil management

O. Reg. 153/04

Records of site condition

O. Reg. 191/11

Integrated Accessibility Standards (Design of Public Spaces)

2.2 Provincial guidance

Reference

Title

MOE (2003)

Stormwater Management Planning and Design Manual

MECP (2022, draft)

Low Impact Development Stormwater Management Guidance Manual (not finalized; use as guidance only)

MOE (2008)

Design Guidelines for Sewage Works

MOE (2008)

Design Guidelines for Drinking-Water Systems

MECP Procedures D-5-4 and D-5-5

Individual on-site sewage systems; private wells (water supply assessment)

MTO (1997)

Drainage Management Manual

MTO

IDF Curve Lookup

MOE Guideline B-6

Erosion and sediment control (where a municipality cites it)

2.3 Canadian standards

Reference

Title

CSA W200:26

Design and construction of bioretention systems and rain gardens

CAN/CSA-W202-18 (R2023)

Erosion and sediment control inspection and monitoring

CSA W204:19

Flood resilient design of new residential communities

CSA W211:21

Management standard for stormwater systems

CSA PLUS 4013:19

Technical guide: Development, interpretation and use of rainfall IDF information

OPSS.MUNI 180

Management of excess materials

OPSS.MUNI 805

Temporary erosion and sediment control measures

OPSD (current)

Ontario Provincial Standard Drawings, incl. 219, 350, 400, 401, 1003 and 1109 series

Fire Underwriters Survey (2020)

Water Supply for Public Fire Protection

TAC (2017, as updated)

Geometric Design Guide for Canadian Roads

ISO 14034

Environmental Technology Verification (manufactured treatment devices)

2.4 Conservation authority and regional guidance (informative)

TRCA and CVC, Low Impact Development Stormwater Management Planning and Design Guide (Sustainable Technologies wiki); TRCA Erosion and Sediment Control Guide for Urban Construction (2019); Cataraqui Conservation Guidelines for Stormwater Management; RVCA, MVCA and South Nation Conservation development policies; municipal engineering standards.

2.5 Additional references

Edition years below shall be rechecked against the publisher's current edition before issue.

Local municipal and conservation authority (priority 1)

  • Brockville: Site Plan Control Manual: Requirements and Guidelines; Application for Site Plan Control, Residential Development (By-law 039-2012 pre-consultation); Residential Lot Grading and Drainage Requirements (posted 20 Mar 2025).
  • Cataraqui Conservation (CRCA): Guidelines for Stormwater Management; Service Delivery Procedures for Plan Review (Rev. 1, June 2018); Appendix D, Guidelines for Geotechnical Investigation (April 2015); 2026 plan review fee schedule.
  • Kingston: Site Plan Control Guidelines (Feb 2025); Site Plan Control By-law 2025-109 (replaces By-law 2010-217).
  • Leeds and Grenville area: Augusta, Application for Site Plan Control and By-law 2778-2009; Edwardsburgh Cardinal, SPC Application Review Process (30 Mar 2023) and fillable application with Appendices A to I; Gananoque, Development Permit By-law 2010-65; Front of Yonge, Planning Application package Appendix A; North Grenville, Engineering Standards Sections A and C (Aug 2022).

Large municipal (priority 2)

  • City of Ottawa: Sewer Design Guidelines SDG 004, Fourth Edition (Dec 2025), chapter 8 and Appendix 10; Site Plan Terms of Reference (Dec 2024); Grading and Drainage Plan Terms of Reference; Site Servicing Study Terms of Reference; Servicing Study Guidelines and checklist.
  • City of Hamilton: Development Application Guidelines, Stormwater Management Report/Plan (updated 13 Feb 2026); Functional Servicing Report guideline.
  • City of Brantford: Design and Construction Manual, Storm Sewers (Linear), V7 (Feb 2023).
  • Town of Oakville: Development Engineering Procedures and Guidelines Manual; Stormwater Management Study/Report terms of reference.
  • Regional Municipality of Peel: Stormwater Design Criteria (June 2019); Stormwater Management Report Requirements (Dec 2022).

Ontario and provincial (priority 3)

  • O. Reg. 235/25 (amending O. Reg. 406/19, on-site and excess soil management).
  • MTO Highway Drainage Design Standards (Nov 2023), SD-1, SD-4, SD-9, SW-1, SW-2, SW-3, WC-7 and WC-8.
  • Ontario Building Code 2024 (O. Reg. 163/24, in force 1 January 2025), being NBC 2020 as amended by the Ontario Amendments document dated 8 October 2024 (O. Reg. 447/24).
  • MNRF (1996), Technical Guide for Great Lakes and St. Lawrence River Shorelines; Atria Engineering (1997), Wave Uprush and Overtopping: Methodologies and Applications, Great Lakes and St. Lawrence River System.

Canadian standards (priority 4)

  • CSA Z800-18, Basement flood protection (cited in Clause 11).
  • CSA A23.1 and CSA A23.3 (concrete design and materials, Canadian edition; governs over ACI where the OBC applies).
  • CSA S6:19, Canadian Highway Bridge Design Code (not a building-load reference).

United States standards (priority 5, informative only)

  • ACI 318 (structural concrete), ACI 360R-10 (slabs-on-ground), ACI 302.1R-15 (floor and slab construction).
  • ASCE 7-22 (supersedes ASCE 7-16 for loads).
  • ASCE/SEI 24 (flood-resistant design and construction), FEMA P-936 (floodproofing non-residential buildings).
  • USACE Coastal Engineering Manual, Part VI (wave runup and overtopping), and the Ahrens and McCartney (1975), Stoa (1979), Losada and Gimenez-Curto (1981), Ahrens and Heimbaugh (1988), and Van der Meer and Stam (1992) papers used in Clause 11.1.6.
  • NRC (2021), Guide for Design of Flood-Resistant Buildings (Coulbourne et al.).

3 Definitions and abbreviations

3.1 Definitions

The following definitions apply in this Standard.

Approval authority: the municipality, upper-tier municipality, conservation authority, ministry or road authority whose approval, permit or acceptance the work needs.

Allowable release rate: the maximum peak discharge from a site to an outlet for a stated design storm, set by the approval authority or, where none is set, by Clause 7.4.

Comment-response matrix: a numbered table that restates each review comment and gives the specific change made and where it is shown.

Emergency overland flow route: the surface path that carries flows above the major-system design storm, or flows when a control fails, to a safe outlet.

Finished floor elevation (FFE): the geodetic elevation of the top of the lowest floor slab at grade.

Hydraulic grade line (HGL): the elevation of water in a sewer system under a stated design storm, including surcharge.

Inlet control device (ICD): an orifice, plug, plate, tube or vortex device that limits discharge from a storage element.

Low impact development (LID): source and conveyance controls that retain, infiltrate, evapotranspire or reuse runoff close to where it falls.

Major system: surface flow paths, including roads, swales and ponding areas, that carry runoff above minor-system capacity.

Minor system: pipes, catch basins, ditches and culverts sized for the minor design storm.

Oil-grit separator (OGS): a manufactured treatment device that removes sediment and floatables by settling and separation.

Pre-consultation record: the written list of required plans, studies and criteria issued by the approval authority before an application.

Qualified person: a person licensed or certified to prepare and seal the work in question: P.Eng. for engineering; OLS for surveys; OALA for landscape plans; RPP for planning justification; P.Geo. or P.Eng. for hydrogeology.

Seasonally high groundwater: the highest groundwater level expected during the year, based on monitoring through the spring freshet or a justified correction.

Underside of footing (USF): the geodetic elevation of the bottom of the lowest footing.

3.2 Abbreviations

Abbreviation

Meaning

ADD / MDD / PHD

Average day / maximum day / peak hour demand

CA

Conservation authority

CLI-ECA

Consolidated Linear Infrastructure Environmental Compliance Approval

EASR

Environmental Activity and Sector Registry

ECA

Environmental Compliance Approval

ESC

Erosion and sediment control

FDC

Fire department connection

FSR

Functional servicing report

IDF

Intensity-duration-frequency

MECP

Ministry of the Environment, Conservation and Parks

MRM

Modified Rational Method

MTO

Ministry of Transportation

OBC

Ontario Building Code

OPSD / OPSS

Ontario Provincial Standard Drawings / Specifications

PTTW

Permit to Take Water

ROW

Right-of-way

SWM

Stormwater management

Tc

Time of concentration

TF

Top of foundation

TSS

Total suspended solids

4 General requirements

4.1 Professional responsibility

4.1.1 Every engineering drawing, calculation and report shall be prepared or checked under the direct supervision of a licensed Ontario P.Eng. and shall be sealed, signed and dated before issue to an approval authority. This includes grading, servicing, SWM, ESC, retaining wall and cost estimate documents.

4.1.2 The SWM report shall be prepared by a P.Eng. with water resources experience. When the site plan changes after a report is issued, the report shall be updated or the author shall issue a letter confirming it still applies.

4.1.3 Work outside INEAS's licensed scope (landscape architecture, surveying, hydrogeology, acoustics, ESA) shall be prepared by the appropriate qualified person and coordinated as recorded in the design basis under Clause 4.3.1.

4.2 Datum, units and base information

4.2.1 All drawings and reports shall be in SI units.

4.2.2 All elevations shall be geodetic and tied to a published benchmark. The benchmark location, description and elevation shall be shown on the grading plan. An assumed datum shall be used only where the approval authority permits it in writing.

4.2.3 Horizontal datum shall be stated. Drawings shall be georeferenced to NAD83 UTM (Zone 17 or 18 as applicable) where the approval authority requires CAD submissions.

4.2.4 The base plan shall be a current boundary and topographic survey by an OLS, with the source and date stated. All plans in a submission shall use the same base.

4.2.5 Existing grades shall extend beyond the property line by the distance the approval authority requires. INEAS default: 6 m, and not less than 3 m.

4.3 Criteria confirmation

4.3.1 The design basis shall state the design criteria that apply: design storms, IDF source, release rates, quality target, water balance target, minimum slopes, cover, and any secondary plan, master drainage plan or watershed criteria.

4.3.2 Each criterion shall be cited to its source document and edition, or to the pre-consultation record. Criteria from another municipality shall not be used as the basis of design unless the approval authority accepts them in writing.

4.3.3 Where interim and ultimate conditions differ (for example, a road reconstruction that is designed but not scheduled), both shall be designed and shown, and the approval authority shall confirm the interim condition in writing.

4.4 Deviations

4.4.1 Any deviation from the approval authority's standards shall be identified, justified and accepted in writing before the submission that relies on it.

4.4.2 Any deviation from this Standard shall be approved by the project's principal engineer and recorded in the decision log.

5 Site information and design constraints

5.1 Site information

5.1.1 The design shall be based on the following information, current for the site:

  1. a boundary and topographic survey by an OLS (Clause 4.2.4);
  2. a geotechnical investigation sealed by a P.Eng. or P.Geo. covering soils, seasonally high groundwater, bedrock or refusal depth, pavement structure, pipe bedding, grade-raise limits, slope stability where applicable, and infiltration rates where infiltration is proposed;
  3. a hydrogeological assessment where private wells or septic systems, dewatering or infiltration in a sensitive area are proposed (Clause 8.6);
  4. records of existing services and utilities, each with its source and quality level (as-built, record drawing, survey, or subsurface investigation at quality levels A to D under CSA S250), confirmed by daylighting where an invert or clearance governs the design;
  5. water boundary conditions or a hydrant flow test not older than the authority's limit [To be confirmed]; and
  6. hydrologic soil group, from site testing or published soil mapping (for example, AgMaps), stated with its source.

5.1.2 Geotechnical, hydrogeological and environmental data older than the authority's limit shall be updated, or covered by a reliance letter from the author.

5.2 Design constraints

The design shall identify, plot and respect:

  1. flood, erosion and dynamic beach hazards, wetlands and the CA regulation limit (O. Reg. 41/24), with geodetic regulatory flood levels;
  2. natural heritage features and their setbacks (commonly 30 m from wetlands and watercourses);
  3. MTO permit control limits under the Public Transportation and Highway Improvement Act, including setbacks for buildings and integral features;
  4. road widenings, 0.3 m reserves and sight triangles required by the road authority;
  5. source protection vulnerable areas (WHPA, IPZ, HVA, SGRA) and the policies that apply to the proposed activities;
  6. municipal drains and field tiles under the Drainage Act;
  7. easements and rights-of-way on title, with their widths; and
  8. existing infrastructure in or near the site that the works could affect (trunk mains, forcemains, high-pressure gas, hydro), with its clearance requirements.

6 Grading and drainage

6.1 Objectives

Grading shall drain every building and paved area positively to a legal outlet, keep runoff from concentrating onto neighbouring land, provide a safe route for flows above the design storm, and meet the barrier-free and fire access slope limits.

6.2 Drainage to neighbours

6.2.1 Grading and drainage shall be contained on the site, or written permission-to-grade shall be obtained from the neighbouring owner or road authority.

6.2.2 Post-development runoff shall not be concentrated onto adjacent lands. Where neighbours have a known drainage complaint, the 5-, 25- and 100-year flows to each boundary shall be quantified and shown to be reduced or unchanged.

6.2.3 External drainage entering the site shall be identified from survey and CA contour mapping, captured and conveyed. External catchments shall not be diverted without justification and the approval authority's acceptance.

6.2.4 No grading shall occur in a county, regional or provincial ROW without that authority's permit. Grades shall tie in at the property line.

6.3 Building elevations

6.3.1 FFE, TF and USF shall be shown for every building and unit, and for adjacent buildings where grading ties in.

6.3.2 Finished grade at the building shall be at least 0.15 m below TF (INEAS default, matching common municipal practice), and shall slope away from the building.

6.3.3 USF and basement slabs shall be set above seasonally high groundwater using the full monitoring record. INEAS default: USF at least 0.3 m above seasonally high groundwater unless the geotechnical engineer designs for permanent dewatering or waterproofing.

6.3.4 Where a site is in or near a CA-regulated flood hazard, the regulatory flood level shall be plotted on the grading plan, and floodproofing elevations shall be shown geodetically on the architectural sections.

6.4 Slope criteria

6.4.1 Slopes shall meet the approval authority's criteria. Where none are published, the INEAS defaults in Table 6.1 apply.

Table 6.1 — Grading slope criteria

Element

Range found in municipal standards

INEAS default

Basis

Grassed / landscaped surfaces, minimum

2%

2.0%

Comprehensive Checklist; Final Grading Checklist

Within 4 m of a building

—

2–4% away from the building

IFP Drawings Checklist

Grassed surfaces, maximum (lawn areas)

5–7% before a terrace or slope treatment

7%

Municipal (Ottawa)

Side slopes and landscape areas, maximum

3:1 (4:1 preferred in some municipalities)

3:1; 4:1 where mown

Comprehensive Checklist

Paved surfaces, minimum

0.5–2.0%

1.5%

Comprehensive Checklist

Swale longitudinal slope, minimum

1.0–2.0%

2.0%

Comprehensive Checklist; Final Grading Checklist

Swale depth, minimum

150–200 mm

150 mm; 200 mm on rear lot lines (Brockville)

Municipal

Swale side slopes, maximum

3:1

3:1

Comprehensive Checklist

Driveway grade

Commonly max 5% over the first 7.5 m from the ROW

2% min, 10% max; authority limit near the ROW governs

Final Grading Checklist

Unheated vehicle ramp, maximum

—

10%

Comprehensive Checklist

Walkway running slope, maximum

O. Reg. 191/11

5% (8% where designed as a ramp)

Comprehensive Checklist

Sidewalk crossfall

—

2% min, 4% max

Comprehensive Checklist

Boulevard / ROW grades

Maximum 2% in some municipalities

Per road authority

Municipal

Lot grading, overall

2–6%

2–6%

Municipal

Finished grade below TF

150 mm

150 mm

Final Grading Checklist

Window wells above finished grade

—

100 mm

Final Grading Checklist

As-constructed grade tolerance

50 mm (Brockville) to 100 mm

100 mm, or the authority's tighter value

Final Grading Checklist

Note: Ranges are taken from the municipal standards listed in Annex A. INEAS defaults apply only where the approval authority has no criterion of its own.

6.5 Ponding and overland flow

6.5.1 The emergency overland flow route shall be shown on the grading plan, not only in the report, with flow arrows, spill elevations and the route to the street or other safe outlet, including across neighbouring lands where it crosses them.

6.5.2 Overland flow routes shall be checked against building openings, window wells and vents. INEAS default freeboard from the 100-year ponding or spill elevation to the lowest opening: 0.30 m [To be confirmed].

6.5.3 Ponding limits and maximum elevations shall be shown for each design event. No ponding shall occur in the ROW, fire routes, barrier-free routes or accessible stalls. Maximum ponding depth in parking areas: per authority, commonly 0.25–0.30 m.

6.5.4 Entrances shall be detailed for drainage: entrance grades, culvert size and inverts after fill, and spill to the roadside ditch. Culvert sizing or the entrance permit shall accompany the submission.

6.6 Grading near buildings, swales and infiltration areas

6.6.1 Ground within 4 m of a building shall slope away from it at 2% to 4%.

6.6.2 Landscaped areas designed to hold water for infiltration may be graded flatter than Table 6.1, to not less than 0.5%, only where they are more than 4 m from a building, outside the overland flow route, and accepted by the authority.

6.6.3 Vegetated swales steeper than [To be confirmed] shall have velocity calculations and erosion protection designed for the computed velocity.

6.7 Retaining walls

6.7.1 Proposed grades shall be checked against existing retaining walls.

6.7.2 Walls of 1.0 m or more in exposed height shall be designed, detailed and sealed by a P.Eng., with global stability checked and guards provided where required. Walls shall be numbered consistently with the wall designer's drawings.

6.7.3 Wall footings shall be dimensioned to the property line and shall not encroach on the ROW or neighbouring land.

6.8 Fill and excess soil

6.8.1 Imported fill and excess soil shall be managed under O. Reg. 406/19. Unsuitable material shall be disposed of under OPSS.MUNI 180.

6.8.2 In a regulated area, a fill plan with cut and fill quantities shall be provided where the CA requires it.

6.8.3 Excess soil shall be managed under O. Reg. 406/19 (On-Site and Excess Soil Management, made under the Environmental Protection Act), as amended by O. Reg. 235/25 (made 23 October 2025). The current consolidation shall be checked before each issue of the Standard or a project submission.

6.8.4 Where the regulation requires an excess soil management plan, it shall be prepared with its contents, qualified person and registry filing as the regulation requires, and the owner, project leader and soil management contractor responsibilities shall be stated on the grading plan notes.

6.8.5 Excess soil quality shall be compared with the Excess Soil Quality Standards in Part II of the Rules for Soil Management and Excess Soil Quality Standards, as referenced in the regulation at the time of issue.

6.8.6 Tracking and registration thresholds and exemptions shall be taken from the current consolidation of O. Reg. 406/19 as amended. [To be confirmed]

7 Stormwater management

7.1 General

7.1.1 The SWM design shall address, as the approval authority and site require: quantity control, quality control, erosion control, water balance, conveyance (minor and major systems), and failure and overflow conditions.

7.1.2 Each criterion used shall be stated with its source and edition, and the design shall show the required and provided value for each.

7.1.3 The design shall cover the current development phase. Future phases shall be assessed as a separate scenario.

7.1.4 Where a development changes runoff only slightly, the design shall still quantify pre- and post-development peak flows for each outlet. A finding that the change is negligible shall state the change in flow as a percentage and the measure that offsets it, and shall be accepted by the authority in writing before quantity control is omitted.

7.2 Hydrology

7.2.1 The approval authority's IDF curves and design storms shall be used, with the source cited. Where the site drains to a provincial highway, the MTO IDF Curve Lookup shall be used for that outlet. Where no authority curve exists, the MTO IDF Curve Lookup or the nearest Environment and Climate Change Canada station shall be used, with the choice justified (see CSA PLUS 4013).

7.2.2 Peak flows for sites up to the authority's limit (commonly 5 ha) may be computed by the Rational Method. Larger sites, ponds and multi-outlet systems shall use a hydrograph model (for example, SWMM-based or Visual OTTHYMO).

7.2.3 Storage shall be sized by the Modified Rational Method at the critical storm duration, or by hydrograph routing. The storage method and its assumptions shall be stated. Storage shall not be sized with a storm duration equal to Tc; see 7.2.9.

7.2.4 Runoff coefficients shall be taken from the authority's table where published; otherwise from a cited source (for example, MTO Drainage Management Manual Design Chart 1.07), selected by surface, slope and soil. Weighted coefficients shall be computed by spreadsheet from CAD-measured areas and checked against percent impervious. Where the authority requires it, coefficients shall be increased by 25% for the 100-year storm, to a maximum of 1.0.

Table 7.1 — Runoff coefficients (informative)

Surface

C (2- to 10-year)

Source

Grass / landscaped

0.25

MTO Design Chart 1.07; City of Kingston uses 0.25 for lawns

Pasture, flat (0–5%), loam or silty loam

0.20 (0.22 at 25-year, 0.24 at 50-year, 0.25 at 100-year)

MTO Design Chart 1.07

Gravel

0.40

MTO Design Chart 1.07

Roof

0.90

MTO Design Chart 1.07

Concrete / asphalt

0.90

MTO Design Chart 1.07

Note: Rideau Lakes required C = 0.70 for compacted gravel driving and parking surfaces. Gravel shall be assigned by its condition: 0.40 for loose or landscaped gravel, and the authority's value (or 0.70) for compacted gravel used by vehicles [To be confirmed].

7.2.5 Tc shall be calculated by a stated method appropriate to the runoff coefficient (for example, Airport Method for C below 0.40, Bransby-Williams for C of 0.40 and above), using measured flow lengths and slopes, and not less than the authority's minimum (commonly 10 to 15 minutes; INEAS default 10 minutes where none is set).

7.2.6 Pre-development conditions shall be delineated from existing survey, with a pre-development drainage plan. Any pre-development impervious area claimed shall be shown on a figure and verified from imagery, survey or historical approvals.

7.2.7 Time of concentration shall be computed by a method matched to the site, and the method shall be stated in the report:

  1. Simple site: one overland and one channel segment to the outlet. Use an empirical formula (for example the Airport Method where C is below 0.40, and Bransby-Williams where C is 0.40 or more, per 7.2.5).
  2. Complex site: segment-by-segment travel time (sheet flow, shallow concentrated flow, channel or pipe flow) from measured lengths and slopes, with the velocity or kinematic equation for each segment stated. Segment methods from US sources (for example NRCS TR-55) are acceptable only where the approval authority accepts them.
  3. Modelling: Tc is derived from a hydrograph model (7.2.2). The model inputs, routing parameters and storm (Chicago or AES, as the authority requires) shall be stated, and the result checked against method (a) or (b).

7.2.8 Where the authority's sewer design guideline applies, its inlet-time rules govern. The City of Ottawa Sewer Design Guidelines (October 2012, Section 5.4.5.1; superseded by SDG 004, December 2025, to be confirmed) use a 15-minute inlet time for backyard drainage structures and base downstream Tc on street sewer segments only.

7.2.9 Storm duration used for storage shall exceed twice the basin Tc, and the storm time step shall be short enough that peak flows are not overestimated (Ottawa Sewer Design Guidelines, 2012, Section 5.4; to be confirmed against SDG 004). Where the time step is less than 10 minutes, peak intensities may be averaged to a 10-minute step only with the authority's agreement.

7.3 Climate change

7.3.1 Where the authority requires a climate change adjustment, it shall be applied as specified. Where none is specified, a stress test shall be reported showing the effect of a [To be confirmed] increase in 100-year intensity on ponding limits and overland flow routes. No redesign is required for the stress test unless a building opening or the ROW is affected.

7.4 Quantity control

7.4.1 Post-development peak flows shall be controlled to the allowable release rate set by the authority, the CA or the governing master drainage plan. Where no rate is set, post-development peaks shall not exceed pre-development peaks for the 2-, 5-, 10-, 25-, 50- and 100-year storms (INEAS default).

Note: Some authorities set a stricter target, such as controlling all events to the 2-year or 5-year pre-development rate (for example, Cataraqui Conservation, Perth) or a unit release rate in L/s/ha. Always confirm at pre-consultation.

7.4.2 Each outlet shall be analysed separately. A summary table shall give pre and post peaks by catchment and by outlet, with a separate line for any flow to an MTO, county or regional ROW, and shall include uncontrolled areas.

7.4.3 Uncontrolled areas (roof edges, perimeter strips, entrances) shall be accounted for in the release calculation, and the destination of their 100-year flow shall be shown.

7.4.4 Where quantity control is waived, outlet erosion shall still be addressed.

7.5 Quality control

7.5.1 Quality control shall meet the authority's level. Where none is set, Enhanced protection (80% long-term TSS removal) under the MOE 2003 manual applies (INEAS default). Normal protection (70%) shall be used only where the authority accepts it.

7.5.2 TSS removal shall be demonstrated for the total tributary area, using a treatment train where one device is not enough, with explicit removal calculations.

7.5.3 Manufactured treatment devices shall be ISO 14034 ETV-verified, sized with the manufacturer's report attached, located correctly relative to the ICD, and credited only with the TSS removal the authority accepts (often 50%).

7.5.4 Phosphorus targets shall be met where a watershed plan or the authority sets one.

7.6 Erosion control and water balance

7.6.1 Where required, erosion control shall be provided by extended detention of the authority's design event (commonly 25 mm over 4 hours, released over 24 to 48 hours), with drawdown calculations.

7.6.2 Where required, a water balance shall show pre-development, unmitigated post-development and mitigated post-development conditions, with areas that sum and justified infiltration rates. The retention target (commonly the first 5 mm to 27 mm) shall be stated with its source. Retained volume shall have a defined pathway (infiltration, evapotranspiration or reuse).

7.6.3 Where no method is prescribed, the water balance may follow the MOE 2003 manual (Table 3.1), with annual precipitation taken from current climate normals or projections for the site and the source stated.

Note: The MECP draft LID guidance manual (2022) proposes a runoff volume control target based on the 90th percentile rainfall event. It is not final and shall be used only where the authority adopts it.

7.7 Low impact development

7.7.1 Every SWM report shall include an LID screening section. LID shall be considered first; where rejected, the reason shall be given.

7.7.2 Infiltration LID shall meet all of the following:

  1. in-situ infiltration testing at each LID location, with a design rate that applies a stated safety factor;
  2. at least 1.0 m separation from the bottom of the facility to seasonally high groundwater and to bedrock;
  3. drawdown within 48 hours, or the authority's limit (LSRCA area: see 7.7.6(e));
  4. setbacks from foundations, property lines, wells and septic systems;
  5. screening against source protection vulnerable areas (WHPA, SGRA, HVA) and contamination;
  6. pre-treatment for runoff from parking and vehicle areas; and
  7. details to the CVC/TRCA LID guide or CSA W200, including underdrain grades.

7.7.3 For small drainage areas, a drywell or other infiltration measure should be considered before piped or trench solutions.

7.7.4 Cisterns and reuse systems shall include drawdown calculations, a reuse demand balance and an O&M plan.

7.7.5 Draft LID volume target (informative, not yet adopted). The MECP draft Low Impact Development Stormwater Management Guidance Manual (January 2022, draft for consultation; ERO 019-4971) proposes a runoff volume control target equal to the 90th percentile rainfall event, and states that it is for informational purposes only. Where the approval authority has not adopted it, and outside the LSRCA area (see 7.7.6(b)), the design shall state the first 5 mm to 27 mm retention target used, with its source, and shall show the 90th percentile volume as a sensitivity case only.

7.7.6 Conservation authority LID guidance may apply in place of the draft manual. The LSRCA Technical Guidelines for Stormwater Management Submissions (January 2026) list a feature-based water balance report as a review item. Whether one is required depends on the applicable policy, and its scope is confirmed with the Authority. The January 2026 text names the Low Impact Development Stormwater Management Planning and Design Guide (2010) in Section 3.1 and the L.I.D. WIKI Guide in Section 6.4. It does not confirm that these are the same document. Within the Lake Simcoe Region Conservation Authority (LSRCA) area, the following apply, taken from Sections 3.2.4, 3.2.6 and 4.1 and Appendices B, L and M of the January 2026 Technical Guidelines:

(a) projects creating 0.5 ha or more of new impervious surface trigger volume control;

(b) new non-linear development shall retain the post-construction direct runoff volume from 25 mm of rainfall from all impervious surfaces, or the 12.5 mm flexible alternative in Section 3.2.6 where the site has restrictions;

(c) for commercial, industrial and institutional sites, infiltration may only be permitted from clean surfaces such as rooftops and landscaped areas;

(d) infiltration credit is not provided for amended topsoil thickness, for conveyance measures such as grassed swales, or for measures where the minimum flow path over a pervious surface is less than 5 m (Section 4.1, p. 26);

(e) infiltration credit is given only where every criterion in Appendix B, Section 1.2 is met, and no credit is given where any is not met. The criteria include a native infiltration rate of 15 mm/hr or greater, a safety factor of 2.5 and drawdown within 24 hours. Where this conflicts with the 48-hour limit in Clause 7.7.2, the more stringent limit shall govern;

(f) the maximum infiltration credit is 25 mm (Appendix B, Table 2);

(g) Appendix L: the direct runoff volume from 25 mm of rainfall from all impervious surfaces shall be captured and retained or treated on site, with no change to hydrologic parameters in the calculation; and

(h) Appendix M: a catchment-based water balance is generally required where a natural heritage feature is supported hydrologically. It uses the Thornthwaite-Mather method and at least one year of pre-development data, unless a governing study sets otherwise.

[To be confirmed]

7.8 Storage and control structures

7.8.1 Every control structure shall have the ICD type, size and location specified, labelled on the grading and servicing plans, with rating calculations using the orifice or weir equation, stated discharge coefficients and heads from the stage-storage table. Manufacturer data shall be attached for proprietary devices.

7.8.2 Minimum orifice size shall be the authority's minimum (for example, 100 mm in North Grenville). Where none is set, INEAS default is [To be confirmed].

7.8.3 Stage-storage and stage-discharge tables shall be provided for every storage element, and the rating curve shall match the stage-storage-discharge table. Swale storage shall account for longitudinal slope.

7.8.4 Control weirs and emergency spillways shall be separate, each with calculations and details.

7.8.5 Rooftop storage shall state volume, maximum depth (authority limit; for example 100 mm in Perth), drawdown time and number of drains, and shall be coordinated with the mechanical and structural engineers. Rooftop storage and orifice plates shall not be relied on where flows reach MTO drainage.

7.8.6 Underground storage shall be labelled by product and detailed, with an emergency overflow and frost protection, and shall not be placed under required parking where the authority prohibits it.

7.8.7 Ponds (wet, dry or combined with fire storage) shall follow the MOE 2003 manual geometry (Tables 3.2 and 4.6 as applicable): side slopes, permanent pool depth, forebay, 2- and 100-year levels, at least 0.3 m freeboard, inlets and outlets, maintenance access and safety barriers.

7.8.8 Storage credited in granular media (sand filter layers, clear stone, chambers) shall use the drainable (effective) porosity of the material from the geotechnical engineer or product data, not total porosity. Where no data exist, the value used shall be justified [To be confirmed].

7.9 Conveyance

7.9.1 The minor system shall be designed for the 5-year storm unless the authority specifies otherwise. The major system shall convey the 100-year (or Regional) storm.

7.9.2 Storm design sheets shall be provided for every segment with pipe material, class, length, slope, capacity and velocity. INEAS default: full-flow velocity 0.6 m/s to 3.0 m/s; design flow not over 80% of capacity where the authority requires it.

7.9.3 A 100-year HGL analysis from the outlet shall be provided where the site sewer connects to a municipal sewer, showing at least 0.3 m freeboard to the lowest USF or foundation drain connection, or the authority's greater value. Foundation drains shall be connected separately from roof drains above the HGL.

7.9.4 Inlet capacity shall be checked: no ponding in minor events in travelled areas; sag catch basins sized for the 100-year with 50% blockage.

7.9.5 Swales and ditches shall have conveyance and velocity calculations and lining for computed velocities.

7.10 Drainage area plans

Pre- and post-development drainage area plans shall show catchment IDs, areas, runoff coefficients and outlets that map one to one to the calculations and model, and grading arrows shall match the catchment boundaries.

7.11 Approvals and long-term obligations

7.11.1 The report shall state the ECA route for private SWM works: a direct MECP ECA, the municipality's CLI-ECA, or an exemption under O. Reg. 525/98, with the reason.

7.11.2 An operation and maintenance manual shall be provided for each SWM facility, OGS and LID feature.

7.11.3 Where municipal drains or field tiles are affected, they shall be documented and the drainage superintendent's sign-off obtained.

7.12 Reference to CSA W211:21

7.12.1 CSA W211:21, Management standard for stormwater systems (National Standard of Canada), provides guidance on the planning, design and construction of stormwater systems. This Standard refers to W211 as published, without restating it. The SWM report shall identify which W211 clauses apply to the project and how each is addressed.

7.12.2 [To be confirmed]

7.13 Provincial stormwater criteria (informative)

7.13.1 MTO Highway Drainage Design Standards (text dated November 2023). Where a discharge reaches a provincial highway or its drainage, the following apply, and the desirable value is used unless the authority sets otherwise. Supersession of the 2008 HDDS shall be confirmed with MTO before use.

  1. Surface drainage (SD-1): freeway, arterial and collector minor system 10% AEP (10-year), major 1% AEP (100-year); local road minor 20% AEP (5-year); depressed roadway minor 4% AEP (25-year), major 1% AEP (100-year).
  2. Storm sewers (SD-4): minimum pipe 300 mm; minimum lateral slope 0.015 m/m; maintenance hole spacing 150 m for pipes up to 1200 mm and 350 m above 1200 mm; trunk minimum velocity 0.75 m/s (smooth) or 0.9 m/s (corrugated), desirable, with 0.5 m/s minimum.
  3. Roadside ditches (SD-9): maximum minor-flow depth 1.0 m; minimum freeboard to subgrade 0.3 m; maximum side slope 2H:1V; minimum longitudinal slope 0.3%.
  4. Stormwater management level of control (SW-1): quantity control depends on receiving system capacity or an MTO-endorsed watershed plan, and the more stringent governs. Design flows at 2, 5, 10, 25, 50 and 100-year and the Regulatory flow. Quality control: enhanced about 80% long-term TSS removal (required where sensitive aquatic habitat will be affected); normal about 70%; basic about 60% (only where habitat is shown to be insensitive).
  5. Wet ponds (SW-2): drainage area 5 ha or more (desirable); 24 h desirable detention for the 40 m3/ha volume, extended to 60 h maximum; orifice 100 mm desirable, 75 mm minimum; 1.5 m desirable total active depth, 2.0 m minimum; side slopes 6:1 desirable within 3.0 m of the permanent pool, 5:1 minimum; forebay at least 1.0 m deep (1.5 m desirable); inlet and outlet pipes 450 mm minimum. Dry ponds draining less than 5 ha: detention up to 48 h. [To be confirmed]
  6. Culverts (WC-7, WC-8): freeboard at watercourse crossings 1.0 m for freeways, arterials and collectors, 0.3 m for local roads; minimum culvert 800 mm diameter on urban freeways and arterials, 600 mm on rural arterials and collectors, 500 mm on local roads over 10 m long and 400 mm on local roads of 10 m or less.

7.13.2 Ontario Stormwater Management Planning and Design Manual (March 2003), Chapter 3, used as the baseline for Section 53 OWRA reviews: long-term TSS removal of 80% (enhanced), 70% (normal) and 60% (basic); enhanced required where sensitive habitat is at risk. Peak flows shall not exceed pre-development values for storms from 2 to 100 years. Channels become unstable at about 10% watershed imperviousness, and the two-year storm is the usual erosion design event. Water balance by the Thornthwaite and Mather method is accepted where data are limited, with the Table 3.1 infiltration values as a check. Storage volume guidance for wet and dry ponds is given in Table 3.2 as m3 per hectare for 35%, 55%, 70% and 85% imperviousness (enhanced wet pond 140 to 250; normal wet pond 90 to 150; basic dry pond 90 to 240).

7.13.3 Units and totals in the 2003 manual's worked example (Table 3.1 net infiltration reduction) are not labelled in the source. Confirm units before quoting.

7.14 City of Ottawa criteria (where Ottawa is the approval authority)

Note: The values in Clause 7.14 are taken from the 2012 Sewer Design Guidelines and the 2016 staff revision summary. The current edition is SDG 004, Fourth Edition (December 2025). Every value in this clause shall be confirmed against SDG 004 and bulletin ISTB-2018-01 before design use.

7.14.1 The City of Ottawa minimum submission content for on-site SWM (Section 2.0) requires a grading and drainage plan stamped by a P.Eng., a servicing plan, a SWM brief or QuickSWM summary, and a geotechnical report where infiltration is proposed. The City's Quick SWM tool (version 1, 2025) is the first-pass screen.

7.14.2 Minor system (2016 staff revisions to the stormwater design guidelines, implemented through technical bulletin ISTB-2018-01): minimum storm sewer design for local streets at the 2-year event without ponding; collector streets at the 5-year event; arterial roads at the 10-year event. Maximum HGL remains 0.3 m below the underside of footing.

7.14.3 Major system: maximum static plus dynamic depth on local and collector streets 0.35 m at the 100-year event; a 15 cm vertical clearance between the spill elevation and the ground at the building envelope; the water level shall not reach any part of the building envelope, including the underside of footing.

7.14.4 Stress test: the 100-year intensity increased by 20% is used to check that the water level remains below the lowest building opening, and that the storm sewer HGL remains below the underside of footing.

7.14.5 Rear yard swales or ditches modelled as attenuation: minimum slope 1.5%, minimum depth 150 mm, maximum depth 600 mm, maximum side slope 3H:1V.

7.14.6 Sanitary design (Ottawa Sewer Design Guidelines, 2012, Section 4; to be confirmed against SDG 004): residential peak factor by the Harmon equation (K = 1 for the design of the sanitary system); commercial and institutional peak factor 1.5; industrial peak factor from Appendix 4-B; infiltration allowance 0.28 L/s per effective gross hectare; foundation drain allowance 5.0 L/s per gross hectare where required.

7.14.7 Storm design (Section 5): Rational Method and Manning's equation are acceptable where the drainage area is under 40 ha and the outlet is not submerged. The 100-year design storm is the 3-hour or 6-hour Chicago storm (Table 5.2) or the AES distributions (Figures 5.1 and 5.2). The IDF data in the 2012 guideline (Table 5.1, 1967 to 1997) are historic and shall be checked against current City IDF data before use.

7.14.9 Water distribution and fire flow criteria in the City of Ottawa Design Guidelines (Water Distribution, July 2010) were not reviewed in this edition. [To be confirmed]

7.14.10 Limit note: the 2016 revision summary is a staff presentation. Its values shall be confirmed against bulletin ISTB-2018-01 before design use. That bulletin was not available in machine-readable form when this edition was prepared.

7.14.11 Note (under development): the full text of SDG 004 (December 2025) was not available when this edition was prepared. Clause 7.14 values remain subject to confirmation against SDG 004 before design use.

8 Site servicing

8.1 General

8.1.1 Site servicing shall be designed to the authority's standards and, where they are silent, to the MOE (2008) Design Guidelines for Drinking-Water Systems and Design Guidelines for Sewage Works.

8.1.2 Before detailed design, as-built records and plan-and-profile drawings of the receiving services shall be obtained, and existing services shall be daylighted where inverts, forcemains or clearances are uncertain.

8.1.3 Municipal standard notes and details shall be used unaltered where they exist; OPSD shall be used only where no municipal detail exists. Inapplicable references shall be removed.

8.1.4 Every existing service shall be shown as reused or decommissioned (water blanked at the main, laterals capped), unless the authority directs otherwise.

8.2 Water

8.2.1 Water demands (ADD, MDD, PHD) shall use the authority's current rates by use and the correct peaking chain, reconciled with the architectural program and the mechanical engineer's fixture-unit demand.

8.2.1.1 Where use-specific demand data are not available, area-based allowances from the MOE (2008) drinking-water guidelines may be used, with the section cited. Peaking factors shall be the authority's or those of the MOE (2008) guidelines for the equivalent population, and shall be stated with their source.

8.2.2 Fire flow shall be calculated by FUS (2020) or the method the authority or OBC Div. B 3.2.5 requires, and shown against boundary conditions or a recent hydrant flow test with static and residual pressures. Boundary conditions shall be dated and requested again at each submission.

8.2.3 Pressures shall be checked against the authority's range; PRVs shall be shown where pressures exceed the maximum.

8.2.4 Water services shall show size and material, domestic and fire split at the property line, isolation valve and box at each municipal connection, curb stop at the public/private limit, meter location (coordinated with the architect), backflow prevention, and bends and stubs per unit. Services shall not run under other units.

8.2.5 Hydrants shall be within the distances set by OBC Div. B 3.2.5 and the fire department (commonly 90 m to the principal entrance and 45 m to the FDC). The FDC frontage shall be kept clear.

8.2.6 Dead-end watermains shall be looped or justified. Where a private watermain is looped, it should be laid out for possible municipal assumption: a 5 m easement, under asphalt, clear of buildings, rigid surfaces and trees.

8.3 Sanitary

8.3.1 Sanitary flows shall use the authority's rates and peaking factors, in the authority's design sheet format, with downstream capacity checked where required (including combined sewer overflow risk in combined areas).

8.3.2 A single sanitary connection with an inspection manhole shall be provided for condominium and multi-building sites. The inspection manhole shall be on private property within the authority's distance of the property line (commonly 1.5 m).

8.3.3 Laterals shall not exceed the main in size; a manhole shall be provided where the lateral exceeds 50% of the main diameter; connections shall be perpendicular, with the invert at or above the springline of the main.

8.3.3.1 Sanitary laterals shall achieve the authority's minimum velocity (commonly 0.6 m/s) at design flow. Where the authority's minimum pipe size cannot achieve it at the expected flow, the design shall show the effect (for example, by peak daily flow) and obtain the authority's acceptance of the size or slope.

8.3.4 Foundation drains shall not connect to the sanitary sewer.

8.4 Storm

Storm services shall meet Clause 7.9. Each building shall have the separate service connections the authority requires.

8.5 Pipe data, cover and separation

8.5.1 The servicing plan shall show for every pipe: size, material, class, slope, length, inverts and cover; and for every structure: ID, type, rim and inverts. Every lateral shall show length and slope.

8.5.2 Cover shall meet the authority's frost cover (for example, 2.0 m in Cornwall; 2.4 m for watermains in Ottawa). Where cover is less, insulation shall be designed and detailed.

8.5.3 A crossing table shall list every watermain and sewer crossing with vertical separation. Separations shall meet MECP Procedure F-6-1 and the authority's standard (2.5 m horizontal and 0.5 m vertical, or approved protection), and shall be labelled at every crossing and close parallel run.

8.5.4 Easement width plus the trench zone of influence shall be checked against foundations.

8.6 Private services

8.6.1 On rural sites, the septic system and well shall be located, with records obtained from the municipality or health unit at project start, and setbacks shown on the civil drawings.

8.6.1.1 Wells shall be constructed and protected under R.R.O. 1990, Reg. 903. Where a well is near vehicle traffic, the wellhead shall be protected by a steel casing and bollards. Separations between wells, septic tanks, leaching beds, buildings and property lines shall meet OBC Div. B Part 8 [To be confirmed].

8.6.2 Daily design sewage flow shall be tabulated (existing plus proposed). Jurisdiction shall be confirmed at concept: OBC Part 8 for systems up to 10,000 L/day; MECP ECA above that.

8.6.3 Where total sewage flows exceed 4,500 L/day, or the authority requires it, a servicing options report and hydrogeological assessment under MECP Procedures D-5-4 and D-5-5 shall be provided.

8.6.4 Any addition on a septic lot shall be checked for Part 8 capacity.

8.6.5 Space for future septic expansion should be reserved on industrial and commercial lots.

8.7 Service sizing

8.7.1 Water services shall be sized for the design demand (and fire service where combined) by velocity and head loss, comparing standard sizes. Velocity shall not exceed 3.0 m/s (MOE 2008) or the authority's lower limit, and residual pressure at the building shall meet the mechanical engineer's requirement. The authority's minimum size and material govern (for example, 20 mm Type K copper in Brockville).

8.7.2 Sanitary and storm laterals shall be sized for design flow at not more than the authority's maximum depth of flow, with full-flow velocity between 0.6 m/s and 3.0 m/s unless the authority sets other limits, and minimum grade per the authority (commonly 1%, 2% preferred).

8.8 Utilities

8.8.1 Hydro, gas, telecommunications and lighting shall be coordinated in a composite layout, with clearances to the utility owners' standards and to the services in Clause 8.5.

8.8.2 Hydro service voltage and demarcation should be confirmed at concept.

8.8.3 Gas installation shall be sequenced before final surfaces; abandonment of existing gas services shall be requested well in advance.

8.9 Construction near existing infrastructure

Where work is near critical municipal infrastructure, the drawings shall note hydro-vac excavation, protection measures and a pre-construction meeting. Pre- and post-construction CCTV of receiving sewers and condition surveys should be budgeted.

9 Erosion and sediment control

9.1 A stand-alone ESC plan, sealed by a P.Eng., shall accompany every SWM report or brief that supports a site plan, and every grading plan where soil is disturbed.

9.2 The ESC plan shall be phased where grading is phased, and shall show as applicable: construction access and mud mat; silt fence (heavy-duty at sensitive limits); catch basin and inlet protection; interim swales, outlets and sediment traps or ponds (sized); stockpile locations and protection; dewatering discharge treatment; tree protection fencing; and the limit of disturbance.

9.3 ESC notes shall cite OPSS.MUNI 805 and the authority's or CA's ESC guideline, name every road authority whose ROW may be affected, and include inspection, repair and removal requirements, including inspection after each rainfall event above the authority's threshold.

9.4 Where the municipality holds a CLI-ECA, ESC notes shall reference its conditions.

9.5 ESC and tree protection shall be installed and inspected before any site disturbance. Pre-grading approvals and CA permits shall be in hand first.

9.6 Inspection and monitoring of ESC measures shall follow CAN/CSA-W202.

9.7 Environmental notes shall include the vegetation clearing window for migratory birds, watercourse setbacks and any EIS commitments, including wildlife exclusion fencing shown separately from silt fence.

9.8 Groundwater discharge during construction shall be tested and permitted under the sewer use by-law, EASR or PTTW as applicable.

9.9 Stockpiles of topsoil and excess soil shall be located outside the flow route and the critical root zone of retained trees, protected with perimeter sediment control, and stabilized within the period the authority or the Standard requires. Stockpile height and side slope limits shall be stated on the ESC plan [To be confirmed].

9.10 Erosion control design shall be checked against the shear stress of the design flow at every outlet and channel, using the critical shear strength of the soil. Where the computed shear exceeds the critical value, the outlet shall be armoured or a stilling measure provided. Erosion thresholds are set by the authority; the Ontario Stormwater Management Planning and Design Manual (2003) uses the two-year storm as the usual erosion design event.

10 Construction verification

10.1 Tolerances

10.1.1 As-constructed grades shall be within 100 mm of design elevations, or within the authority's tighter tolerance (for example, 50 mm in Brockville).

10.1.2 As-constructed finished grade shall be at least 150 mm below TF, and window wells shall project at least 100 mm above finished grade.

10.1.3 Surface slopes, swale grades and depths, and slopes away from buildings shall meet Table 6.1 after final surface treatment.

10.2 Hold points

The design shall identify the stages at which engineering review is needed before work is covered. As a minimum:

  1. subgrade and engineered fill before placement of structures or pavement;
  2. pipe bedding and services before backfill;
  3. ICD, OGS, underground storage and LID installation before backfill or planting;
  4. ponds and swales at final grade before seeding or sodding; and
  5. final grades before acceptance.

10.3 Testing

10.3.1 Watermains and water services shall be pressure tested and disinfected to the authority's standard and AWWA C651.

10.3.2 Sewers shall be tested and inspected (leakage, deflection, CCTV) to the authority's standard.

10.3.3 Compaction shall be verified against the geotechnical engineer's requirements.

10.4 Basis of certification

Certification of grading, servicing and SWM works shall be based on a survey of as-constructed elevations and inverts by an OLS, together with field review at the hold points in Clause 10.2. Items not reviewed shall be excluded from the certification.

11 Flood hazard and structural floodproofing

11.1 General

11.1.1 This Clause applies where a building or ancillary structure is in or near a regulated flood hazard, or where its foundation, walls or slab are designed to resist flood loads. Floodproofing shall be designed by a P.Eng. (structural), and the method shall be shown on the grading, servicing and architectural sections.

11.1.2 The design flood shall be the Regulatory Flood Level (RFL) from the conservation authority geoportal, or as confirmed in writing by the authority. Where the authority uses the 1:100-year flood, the design shall use the 1:100-year flood elevation.

11.1.3 Floodproofing shall be stated as dry or wet on the plans. Avoiding flood-prone areas is the first measure, and the report shall say why a flood-free location was not used.

11.1.4 Regulated limits for the conservation authority area (RVCA or CRCA, as applicable): inland lake, the 100-year flood level plus wave uprush allowance plus 15 m; watercourse, top of channel bank plus 15 m; floodplain, mapped flood hazard plus 15 m; slope hazard, mapped erosion hazard plus 15 m (or a site-specific study); meander belt, 20 times bankfull width plus 15 m; dynamic beach, mapped hazard or 30 m from waterfront lands plus 15 m; wetland, mapped boundary plus 30 m. Wave uprush allowance: taken from the authority's Lake Ontario and St. Lawrence River 100-year flood level and wave uprush table for the nearest reference station, unless a site-specific study under 11.1.5 is accepted by the authority. The uprush value is added to the 100-year flood level; it does not replace it.

11.1.5 A site-specific wave uprush study shall be prepared where the shore has a slope, armour or geometry that the authority table does not cover, or where the authority requires it. The study shall (a) state the 100-year flood level, the still water level and the wave climate (significant wave height, peak period and depth at the toe) with their data source; (b) identify the shore slope, roughness and armour units; (c) calculate uprush with at least two methods that apply to the slope and wave conditions; and (d) state the applicability limits of each method used.

11.1.6 Regular-wave methods shall include Ahrens and McCartney (1975) and Stoa (1979) for rough slopes, with Losada and Gimenez-Curto (1981) as a check. Irregular-wave methods shall include Ahrens and Heimbaugh (1988) for riprap-protected slopes from 1:2 to 1:4, and Van der Meer and Stam (1992) for rock revetments and breakwaters. Rough-slope reduction factors shall be justified against the armour size.

11.1.7 The design uprush elevation shall be the 100-year flood level plus the greatest uprush from the selected methods, unless the authority accepts a lower value in writing with reasons. Results shall be tabulated by method, showing uprush, horizontal run, flood elevation and flood hazard elevation, and the governing value shall be identified.

11.1.8 Input data shall be checked before use. Where a wave period from a data source does not agree with the period implied by the wave height, the discrepancy shall be resolved and reported. Each method's applicability check shall be shown, including the depth ratio ds/H0' of 3 or more for Stoa, the slope range for each method, and the surf parameter range for Van der Meer and Stam.

11.2 Elevations

11.2.1 Underside of living space floor assembly (floor joists): RFL + 0.3 m.

11.2.2 Electrical and mechanical services (hot water tanks, furnaces, power boxes, outlets and ductwork): RFL + 0.3 m.

11.2.3 Openings in exterior walls (windows, doors, vents), dry floodproofing: RFL + 0.3 m.

11.2.4 Top of basement floor, dry floodproofing: RFL - 1.5 m.

11.2.5 Crawlspace height (basement floor surface to underside of joists), wet floodproofing: 1.8 m maximum.

11.2.6 Flood vents, wet floodproofing: the bottom of each vent no more than 0.15 m above grade, and the top of each vent below the RFL.

11.2.7 Top of drilled well air vents: 0.4 m above grade or 0.3 m above the RFL, whichever is greater.

11.2.8 Minimum roadway elevation for safe access: RFL - 0.3 m.

11.3 Floodproofing methods

11.3.1 Dry floodproofing: enclosed foundation with waterproofing; elevation on fill (side slopes not steeper than 3H:1V unless designed by an engineer, with erosion protection); elevation on columns or posts; or berms and walls.

11.3.2 Wet floodproofing: enclosed foundation with flood vents, or an open foundation or crawlspace.

11.3.3 Utilities: backflow prevention valves on sewage and drainage pipes; watertight sump covers, anchored against buoyancy; pumps with backup power; sealed sump discharge lines with check valves; manual shut-off valves on fuel lines; anchored oil and propane tanks; separate waterproof circuits for outlets, switches and lighting; small-diameter plastic conduit for wiring below the RFL.

11.3.4 Sump pumps shall not be relied on alone to resist buoyancy unless the wall and slab are designed for full hydrostatic force. Sump pumps can fail through mechanical fault, power loss, overload or frozen discharge.

11.4 Loads

11.4.1 Hydrostatic loads (lateral pressure on walls and buoyancy or uplift on slabs and foundations) shall be checked for every floodproofed foundation. Slabs shall span between foundations or beams, and foundations shall be checked against the uplift force with the weight of the structure above.

11.4.2 Hydrodynamic loads (front pressure, drag and suction from moving water) shall be checked where overland flooding occurs. Shear stress and scour at piers and footings shall be considered.

11.4.3 Ice and debris: where overland flooding exceeds 0.3 m, ice forces shall be considered in the design. A debris weight of 4.5 kN is recommended by the National Research Council (Guide for Design of Flood-Resistant Buildings, 2021). Impact loads are not a compulsory design condition, and the engineer applies them to the most critical member only.

11.4.4 Wave loads and the hydrodynamic, debris and ice loads applicable to lakeside structures shall be evaluated and stated in the design brief.

11.4.5 Waterproofing of basement floors on ground shall meet OBC 9.13.3.5 (membrane between two concrete layers, each not less than 75 mm thick, continuous with the wall membrane). [To be confirmed]

11.4.6 Where the RFL lies within a depth below the bearing surface of the foundation equal to the foundation width, the allowable soil bearing pressure shall be reduced by the factor set in OBC 9.4.4.3 [To be confirmed].

11.5 Flood openings for wet floodproofing

11.5.1 Each enclosed area shall have at least two openings, on opposite exterior walls. Openable windows on opposite sides are required by the MNR Technical Guide for River and Stream Systems: Flooding Hazard Limit (2002), Appendix 6 (Floodproofing) [To be confirmed].

11.5.2 Opening sills shall be no more than 150 mm above grade, and openings shall be below the RFL. Insect screens or grilles shall not block the flow. Detachable vent covers that are installed by hand do not satisfy this Clause.

11.5.3 Net open area shall be 1 in2 per 1 ft2 of enclosed area (prescriptive), or be calculated hydraulically for a rate of rise and fall of 5 ft per hour with a discharge coefficient of no more than 0.4. Net area excludes grilles. Openings in interior walls do not count toward the exterior area.

11.6 Drainage and site design

11.6.1 Grading shall direct water away from foundation walls. Reverse-slope driveways are prohibited (CSA Z800-18).

11.6.2 Window wells shall have a cover, and a drain to the foundation drainage system (CSA Z800-18).

11.6.3 Backfill shall be capped with an impermeable surface (fine-grained low-permeability soil, membrane or insulation board). The initial grade shall be exaggerated for settlement, and the cap shall extend beyond the excavation line (CSA Z800-18).

11.6.4 Foundation drains, backfill caps and window well drains are not reliable in a 1:100-year event. Dry or wet floodproofing shall still be provided. These measures reduce minor-event basement flooding for wet-floodproofed buildings.

11.6.5 Site changes shall not increase flood risk on adjacent or downstream properties.

11.7 Submission

11.7.1 The submission shall include site plan and grading sections with existing and proposed geodetic elevations confirmed by an OLS or P.Eng., foundation sections, building elevations and servicing plans.

11.7.2 The submission shall include a soils report, hydrostatic load calculations, bearing capacity calculations, and cut and fill volumes where earthwork changes the grades.

11.7.3 A hydraulic model report shall be provided where required by the authority, with input and output data, summary tables and mapping. [To be confirmed]

11.7.4 The plan or design brief shall state the flood velocity and flood depth, the soil bearing capacity, the reduction in bearing capacity where the RFL is within the foundation width, existing drainage infrastructure and stormwater systems, and safe ingress and egress routes during a flood.

11.7.5 Reports shall be reviewed against the technical review checklist for floodproofing reports (draft, March 2026).

12 Residential lot grading and drainage (prescriptive design)

12.1 Scope and application

12.1.1 This Clause sets prescriptive design requirements for grading and drainage plans for buildings to which Part 9 of Division B of the OBC applies, on urban and rural residential lots, including new dwellings, additions, additional residential units, accessory buildings, pools and lot regrading.

12.1.2 This Clause applies in addition to Clause 6. Where this Clause and Clause 6 or Clause 11 differ, the more stringent requirement governs. Where the approval authority publishes its own criterion, that criterion governs (Clause 0.3).

12.1.3 A design that meets every requirement of this Clause is deemed to meet the INEAS minimum level of practice for a residential grading and drainage plan. Any departure shall be recorded as a deviation under Clause 4.4.

12.1.4 A grading and drainage plan shall be prepared where any of the following is proposed: (a) a new dwelling, including reconstruction on an existing foundation; (b) an addition at grade, including an addition on helical piles; (c) a roofed deck or patio in a side or rear yard; (d) an accessory building or structure larger than 15 m²; (e) new hard surface, or any change of grade, in a side or rear yard; (f) a pool; (g) a below-grade entrance; or (h) a catch basin, area drain, soakaway pit or other LID measure.

Note: Many municipalities trigger a lot grading plan with fewer or different items. Confirm the trigger list under Clause 4.3.

12.2 Design approach

12.2.1 The designer shall review the topographic survey and mark up the natural drainage paths before laying out proposed grades. The proposed drainage pattern shall follow the natural drainage paths wherever practical.

12.2.2 The applicable municipal lot drainage by-law, subdivision master grading plan and any registered drainage easement shall be reviewed and cited on the plan.

12.2.3 The drainage pattern shall be identified and labelled on the plan as one of: Type A (back-to-front), where the whole lot drains to the street; Type B (split), where the front drains to the street and the rear to a rear-yard swale or rear-lot catch basin; or Type C (front-to-back), where the whole lot drains to the rear. Type B and Type C lots depend on downstream lots, and the easement or master grading plan shall be confirmed before either is used.

12.2.4 Grade breaks, swale centrelines and high points shall be set first, then building elevations, then driveway and walkway grades, so that the building sits above the drainage system rather than the drainage being fitted around the building.

12.3 Infill and rebuild lots

12.3.1 This subclause applies to a new dwelling, rebuild or major addition on a lot within an established neighbourhood.

12.3.2 Before design, the existing condition along every shared lot line shall be recorded: spot elevations at the lot corners, at intervals not exceeding 5 m along the line [To be confirmed], and at visible neighbouring foundations, window wells, walkouts and openings within 3 m of the line, with dated photographs. The record shall be kept in the project folder.

12.3.3 Existing grades at lot corners and along shared lot lines shall be maintained, unless the neighbour's written consent is obtained (Clause 6.2).

12.3.4 The development shall not increase the rate or volume of runoff to any neighbouring lot. Where new roof or hard surface drains toward a neighbour, it shall be captured and directed to the street, a swale on the subject lot, or a soakaway under 12.13.

12.3.5 Where the new dwelling is set higher than the existing grade, the transition shall be made within the subject lot, by slopes within Table 12.1 or by walls under 12.11 and 12.12, and shall not create a drainage path onto a neighbouring lot.

12.3.6 Existing drainage from neighbouring lots that crosses the subject lot shall be accepted and conveyed, not blocked (Clause 6.2).

12.3.7 The plan shall show the proposed TFW and FFE beside the neighbouring dwellings' approximate grades, and the designer shall confirm the grade used for the zoning height calculation (established grade or average grade, as the by-law defines it) with the planner.

12.4 Building elevations

12.4.1 Each building and addition shall show, on the footprint, the top of foundation wall (TFW), finished floor (FFE), basement slab (BSE), underside of footing (USF) and garage floor (GFE), all geodetic.

12.4.2 Finished ground, including hard surfaces, at the foundation shall be at least 150 mm below TFW (OBC 9.15.4.6).

12.4.3 Where cladding is adversely affected by moisture, such as wood or wood-based siding, finished ground shall be at least 200 mm below the bottom of the cladding (OBC 9.27.2.4).

12.4.4 USF shall be at least 1.2 m below finished ground, or deeper where OBC Table 9.12.2.2 requires, unless the foundation is designed under Part 4 or as a frost-protected shallow foundation (OBC 9.12.2.2).

12.4.5 USF shall be at least 0.3 m above seasonally high groundwater (Clause 6.3).

12.4.6 Garage, walkout and below-grade entrance elevations shall be checked against the 100-year ponding or spill elevation with the freeboard in Clause 6.5.2.

12.4.7 The initial grade against the foundation shall be exaggerated to allow for backfill settlement, and the backfill shall be capped with low-permeability material extending beyond the excavation line (Clause 11.6.3, CSA Z800-18).

12.5 Geometric requirements

12.5.1 Slopes shall meet Table 12.1, which restates Table 6.1 for residential lots and adds the values specific to Part 9 lots.

Table 12.1 — Residential grading geometry

ElementMinimumMaximumBasis
Ground within 4 m of a building2% away from building4% (Clause 6.6)Table 6.1; INEAS checklist
Grassed and landscaped surfaces2.0%7% before terracingTable 6.1
Front and rear yards, overall2%15%; above this, terrace with 3:1 slopes or wallsINEAS checklist
Side slopes and embankments—3:1; 4:1 where mown; 2:1 only for planted, stabilised banks under 0.6 m high [To be confirmed]Table 6.1; INEAS checklist
Slopes entering a swale—3:1INEAS checklist
Infiltration or ponding area (only beyond 4 m from a building)0.5%2%Clause 6.6; MOE SWMPDM 2003
Patios, walkways and other paved surfaces (not driveways)1.5%2% across a walking surface; walkway running slope 5% (8% as a ramp)Table 6.1
Driveway2%7% desirable, 10% absolute; authority limit near the ROW governsTable 6.1; INEAS checklist
Driveway change in grade without a transition—8% [To be confirmed]INEAS default
Swale longitudinal slope2.0% (1.0% only with a subdrain under 12.9.6)—Table 6.1
Swale depth150 mm; 200 mm on rear lot lines (Brockville)300 mm on side yards [To be confirmed]Table 6.1
Swale side slopes—3:1Table 6.1
Finished ground below TFW150 mm—OBC 9.15.4.6
Finished ground below moisture-sensitive cladding200 mm—OBC 9.27.2.4
Window well above finished ground100 mm—Table 6.1
As-constructed grade tolerance—±100 mm, or the authority's tighter valueTable 6.1

12.5.2 Yard grade shall be calculated as the elevation difference divided by the horizontal distance from the rear (or front) wall of the dwelling to the lot line. Where it exceeds the yard maximum in Table 12.1, the yard shall be terraced with 3:1 slopes, landscape walls (12.11) or retaining walls (12.12).

12.6 Driveways

12.6.1 Driveway grades shall meet Table 12.1. The approval authority's limit over the first metres from the ROW governs.

12.6.2 Driveways shall be set at least 0.6 m from the side lot line to leave room for a side-yard swale, unless the swale is carried in a curb and gutter or a trench drain.

12.6.3 Swales shall not discharge onto a driveway.

12.6.4 Reverse-slope driveways (draining toward the garage) shall not be used. On a flood hazard site they are prohibited (Clause 11.6.1). Elsewhere, where the approval authority permits one and no other layout is practical, a catch basin or trench drain shall be provided at the low point (OBC 9.14.6.4), designed under 12.10, with an overland spill route that does not pass through the garage, and the deviation shall be recorded under Clause 4.4.

12.6.5 The driveway cross-section, materials, curb cuts, and any removal and reinstatement of curb, sidewalk or boulevard shall be shown, with a note that disturbed municipal works are reinstated to the authority's standard.

12.7 Patios, decks, hard landscaping and pools

12.7.1 Patios, walkways and interlock against a building shall slope away from it at the slopes in Table 12.1, and their top surface shall be treated as finished ground for 12.4.2 and 12.4.3.

12.7.2 Permeable pavers shall be treated as impervious for runoff and grading unless they are designed and detailed as an infiltration measure under 12.13.

12.7.3 Ground under a deck or porch shall slope away from the building at not less than 2%. Deck and porch footings, steps and skirting shall not block a swale or overland flow route.

12.7.4 Pools and hot tubs shall not be located in a swale, overland flow route or ponding area. The surrounding deck or apron shall drain away from both the pool and the dwelling.

12.7.5 Pool backwash and drain-down water shall be discharged as the authority's sewer-use or pool by-law requires. Where no requirement is published, it shall be dechlorinated and released to a permeable area on the subject lot at a rate that does not leave the lot, and never onto a neighbouring lot.

12.7.6 Excavated pool material left on site shall be shown with its final grades. Fill shall not raise the grade along a shared lot line (12.3.3).

12.8 Walkouts, below-grade entrances and window wells

12.8.1 An exterior stairwell to a basement or below-grade entrance shall have a drain at the bottom landing connected to the foundation drainage system or sump (12.15), not to the sanitary sewer.

12.8.2 Ground around the top of an exterior stairwell shall slope away from it, and the top of the stairwell wall or curb shall be at least 100 mm above the adjacent finished ground [To be confirmed]. A roof or canopy over the stairwell is recommended.

12.8.3 Walkout doors and below-grade entrance thresholds shall be above the 100-year ponding or spill elevation with the freeboard in Clause 6.5.2, and the ground outside them shall slope away at not less than 2% for at least 1.5 m [To be confirmed].

12.8.4 Window wells shall project at least 100 mm above finished ground (Table 12.1), shall be drained to the footing level or another suitable location (OBC 9.14.6.3), and shall not be located in a swale or overland flow route. Covers are recommended (Clause 11.6.2, CSA Z800-18).

12.8.5 The access path to an additional residential unit shall be graded so that it does not collect or carry runoff to the entrance. Where the path and a side-yard swale share a side yard, the plan shall show that both fit, with the swale geometry in Table 12.1.

12.9 Swales and subdrains (French drains)

12.9.1 Swales shall meet Table 12.1 and shall be shown with centreline elevations opposite each building corner and at intervals along straight runs, as top–bottom–top spot elevations.

12.9.2 A side-yard swale shall carry flow from no more than three rear yards or about 60 m of swale. A rear-yard swale shall carry flow from no more than six rear yards and shall not exceed three lot widths for single detached lots. Beyond these limits a rear-lot catch basin or piped system shall be provided (12.10).

12.9.3 Velocity in grassed swales shall not exceed 0.8 m/s for the design storm unless erosion protection is designed. Swales above the slope threshold in Clause 6.6 need velocity and erosion design.

12.9.4 A retaining wall next to a swale shall have its top at least 50 mm above the swale invert, and the swale shall not undermine the wall footing.

12.9.5 Fences crossing or along a swale shall leave at least 150 mm clear above the swale invert.

12.9.6 A subdrain shall be provided where: (a) a swale's longitudinal slope is less than 2.0%; (b) a retaining wall more than 0.9 m high, or any wall beside a swale under 2%, retains soil; (c) seepage, high groundwater or a spring is known; or (d) an infiltration trench is used under 12.13.

12.9.7 Subdrains shall be perforated pipe, minimum 100 mm diameter, in a clear stone trench wrapped in non-woven geotextile to OPSS.MUNI 1860, laid at not less than 0.5% to a free outlet (daylight, swale, ditch or an approved storm connection), with the outlet invert shown and a cleanout at the upstream end [To be confirmed: pipe size, stone gradation and minimum slope].

12.10 Catch basins and area drains

12.10.1 A catch basin or area drain shall be provided where runoff from a driveway is likely to accumulate or enter a garage (OBC 9.14.6.4), and where the swale limits in 12.9.2 are exceeded.

12.10.2 Where a catch basin or area drain is proposed: (a) the grading and drainage plan shall be sealed by a P.Eng.; (b) a Stormwater Management Brief sealed by a P.Eng. shall show that the structure captures the post-development 5-year storm without surface ponding and that an overland route carries larger storms without affecting buildings (Clause 6.5); and (c) after construction the engineer shall provide as-built certification (letter, as-built plan, and CCTV of the connection where the authority requires it).

12.10.3 Connection details shall show rim and invert elevations, pipe material, a lead of at least 250 mm at not less than 2.0%, at least 1.0 m from any property line, frost protection where 1.2 m of cover over the obvert cannot be kept, and the applicable OPSD or municipal standard [To be confirmed against each authority].

12.11 Landscape walls

12.11.1 A landscape wall is a gravity wall (segmental block, armour stone or timber) with an exposed height of 0.6 m or less that does not support a building, driveway, parking area or other surcharge.

12.11.2 A landscape wall shall be used where the grade change cannot be made within the slope limits of Table 12.1 in the available horizontal distance, and the change is 0.6 m or less.

12.11.3 Landscape walls shall be at least 0.3 m from the property line, shall not sit in a swale or overland flow route, and shall be built to the manufacturer's published installation guide.

12.11.4 Tiered walls shall be treated as one wall for height unless the horizontal setback between tiers is at least twice the height of the lower wall [To be confirmed].

12.12 Retaining walls

12.12.1 A retaining wall is any wall higher than 0.6 m, or any wall that supports a surcharge (building, driveway, parking, a slope above or another wall).

12.12.2 A retaining wall exceeding 1,000 mm in exposed height adjacent to public property, access to a building, or private property to which the public is admitted is a designated structure under OBC Division A, Article 1.3.1.1., requires a building permit, and shall be designed by a P.Eng.

12.12.3 INEAS default: every retaining wall 1.0 m or more in exposed height shall be designed by a P.Eng., with sealed drawings and a global stability check, whether or not it is a designated structure (Clause 6.7).

12.12.4 A guard shall be provided where a walking surface has a difference in elevation of more than 600 mm to the adjacent surface, or where the adjacent surface within 1.2 m of the walking surface slopes more than 1 in 2 (OBC 9.8.8.1). The plan shall flag where a wall, or a path next to a wall, creates this condition.

12.12.5 Retaining walls shall be at least 0.3 m from the property line, and footings and geogrid shall stay on the subject lot unless a written agreement with the neighbour is provided.

12.12.6 Walls more than 0.9 m high shall have a subdrain behind them (12.9.7).

12.13 Soakaway pits, infiltration trenches, rain gardens and rear-yard ponding

12.13.1 These measures shall be designed to the MOE Stormwater Management Planning and Design Manual (2003) and the CVC/TRCA Low Impact Development Stormwater Management Planning and Design Guide (current edition), and shall be supported by a geotechnical investigation confirming the infiltration rate and seasonally high groundwater.

12.13.2 Location: (a) soakaway pits and infiltration trenches at least 5 m from any building foundation, located so that drainage is away from the building (OBC 9.14.5.3); rain gardens and ponding areas at least 4 m from foundations (MOE SWMPDM 2003); (b) not over, or within the clearances of, a sewage system leaching bed; (c) surface drainage directed away from wells and leaching beds (OBC 9.14.6.2); (d) not next to highways or major roads.

12.13.3 Suitability: native soil infiltration rate at least 15 mm/h; seasonally high groundwater and bedrock at least 1.0 m below the bottom of the facility (OBC 9.14.5.3 also requires groundwater below the bottom of a dry well); catchment under 0.5 ha for a soakaway pit and under 2 ha for an infiltration trench; ponding areas on ground sloping less than 2%.

12.13.4 Sizing: store at least 5 mm, and target 20 mm, of runoff over the contributing roof area without overflow, using a 40% void ratio for clear stone and a 24-hour drawdown. Where a trench serves several lots, store the runoff from a 4-hour, 15 mm storm. Where other impervious area drains to the facility, size it with the authority's IDF data. Calculations shall be attached.

12.13.5 Every facility shall have an overflow to the overland route or storm system, a frost-protected inlet header, and pretreatment (such as a leaf screen or sump) for roof inflow.

12.13.6 Rain gardens: ponding depth not more than 150 mm; slopes entering not more than 5%; footprint about 25% of the contributing hard surface; clean sources only (roofs and landscaped areas); native planting to the local conservation authority's guidance.

12.13.7 Rear-yard ponding: depth not more than 100 mm, with a defined overland route for anything deeper.

12.13.8 Standard notes shall cover: geotechnical confirmation before construction; marking the area to prevent compaction; diverting construction runoff until the site is vegetated; and inspection and maintenance.

12.14 Roof leaders and downspouts

12.14.1 Downspouts not connected to a sewer shall have extensions that carry rainwater away from the building in a manner that prevents soil erosion (OBC 9.26.18.2).

12.14.2 INEAS default: extensions shall discharge at least 1.8 m from the foundation, beyond the backfill zone, onto a splash pad or rip-rap, toward a swale, rain garden or landscaped area, and at least 2 m from a public sidewalk. They shall not discharge onto a driveway, walkway or neighbouring lot.

12.14.3 Large roofs shall be served by several downspouts spaced to spread the flow.

12.14.4 The location and discharge direction of every existing and proposed downspout shall be shown on the plan.

12.15 Foundation drainage, sumps and backflow protection

12.15.1 The plan shall state where the foundation drains discharge: storm sewer, drainage ditch, dry well or sump (OBC 9.14.5.1). Where gravity drainage is not practical, an automatic sump pump shall be provided (OBC 9.14.5). Foundation drains shall not be connected to the sanitary sewer.

12.15.2 Sumps receiving water from a subsoil drainage pipe shall have a water- and air-tight cover (OBC 2024, Part 7) [article to be confirmed].

12.15.3 Sump pump discharge shall be shown on the plan. It shall not discharge into a side yard; it shall discharge beyond the backfill zone to a permeable surface via a splash pad, or to the storm system where the authority permits, with freeze protection at the outlet and a check valve. A backup power supply or backup pump is recommended (Clause 11.3.3, CSA Z800-18).

12.15.4 Where a dwelling is served by a municipal sanitary sewer, the servicing or grading plan shall show a normally open backwater valve on the sanitary building drain where the building drain may be subject to backflow (OBC 7.4.6.4), and wherever the authority requires one for new dwellings or new basement units. INEAS default: show one for every new dwelling and every new below-grade dwelling unit on municipal sanitary service [To be confirmed].

12.15.5 Where the authority has a foundation drain collector or third-pipe system, the connection shall follow the authority's standard.

12.15.6 CSA Z800-18 (R2023), Guideline on basement flood protection and risk reduction, shall be used as the reference for basement flood protection measures on Part 9 dwellings.

12.16 Trees and topsoil

12.16.1 Trees to be preserved, municipal trees, and neighbouring trees whose protection zone extends onto the lot shall be shown with their tree protection zone, to the municipal tree by-law or, where none applies, the dripline.

12.16.2 No grade change, stockpile, trench or equipment access shall occur within a tree protection zone unless an arborist's report supports it.

12.16.3 Before topsoil is placed, compacted subgrade in landscaped areas shall be scarified. Landscaped areas shall be restored with at least 300 mm of topsoil, amended where needed for infiltration [To be confirmed].

12.17 Lot-level erosion and sediment control

12.17.1 Every residential grading plan shall show, as a minimum: (a) silt fence on the downslope sides of the work; (b) a stabilised construction entrance; (c) inlet protection on catch basins in the adjacent road and on the lot; (d) stockpile locations away from swales, lot lines and drainage structures, covered or stabilised; and (e) stabilisation of disturbed areas as soon as final grades are reached.

12.17.2 Measures shall be inspected and maintained to Clause 9 and CSA W202:18, Erosion and sediment control inspection and monitoring.

12.18 Rural lots: wells and sewage systems

12.18.1 The plan shall show the well and the sewage system with the clearances of OBC Article 8.2.1.6.

Table 12.2 — Part 8 clearances to show on rural grading plans

ObjectSeptic tank (treatment unit), Table 8.2.1.6.ALeaching bed (distribution piping), Table 8.2.1.6.B
Structure1.5 m5 m
Well with a watertight casing to at least 6 m15 m15 m
Any other well15 m30 m
Lake, pond, reservoir, river, spring or stream15 m15 m
Property line3 m3 m

Note: Leaching bed clearances increase by twice the height the bed is raised above original grade (OBC 8.2.1.6). Final clearances shall be confirmed against the sewage system design.

12.18.2 Grading shall direct surface water away from wells and leaching beds (OBC 9.14.6.2). Swales, soakaways, ponding areas, downspouts and sump discharges shall not drain onto or toward a leaching bed or its mantle.

12.18.3 The well shall be located and constructed under R.R.O. 1990, Reg. 903. Where the well is near a driveway or parking area, the plan shall show the steel casing with care-and-control provisions and bollards on the three exposed sides, with source water protection signage [To be confirmed: casing height above grade under Reg. 903].

12.18.4 Roadside ditch entrances shall show the culvert size (at least 450 mm unless the road authority states otherwise), inverts and ditch grades (Clause 6.5.4).

12.19 Flood resilience

12.19.1 Lots in or near a regulated flood hazard shall also meet Clause 11.

12.19.2 New multi-lot residential development on greenfield land shall be designed with reference to CSA W204:19, Flood resilient design of new residential communities, as best practice.

12.19.3 The lot-level measures of CSA Z800-18 in 12.4.7, 12.8 and 12.15 apply to every new dwelling.

12.20 Standard details

12.20.1 The grading and drainage plan shall include, or reference from a detail sheet, a scaled detail for each of the following that is used: side-yard and rear-yard swale cross-sections; downspout splash pad and extension; subdrain trench; soakaway pit or infiltration trench (with stone, geotextile, overflow and observation port); catch basin and lead; landscape wall; retaining wall drainage; window well drain; exterior stairwell drain; driveway culvert; silt fence and construction entrance.

12.20.2 Details shall be drawn from the INEAS standard detail library [To be confirmed: library to be created in the CAD Templates folder] and adapted to the project; manufacturer details shall be used for proprietary products.

12.21 Submission requirements

12.21.1 Sheet C-002 Grading and Drainage of the INEAS Standard Drawing Package, on the INEAS title block with the project number, address, revision block and issue status.

12.21.2 Metric scale of 1:100, 1:200, 1:250 or 1:300, with a key plan, north arrow and bar scale.

12.21.3 Base information: OLS or survey-grade topography; geodetic benchmark with location and elevation (Clause 4.2); property lines, easements, ROW widths and centrelines; adjacent municipal works (hydrants, poles, catch basins, maintenance holes, sidewalks); buildings and features on adjacent lots within 5 m; watercourses, floodplain and conservation authority limits.

12.21.4 Existing and proposed elevations at: (a) all lot corners and the midpoints of the front, side and rear lot lines; (b) grade changes, transitions and break points; (c) the front, rear and sides at the foundation of the dwelling or addition; (d) edge of pavement or top of curb at the projected lot lines and the driveway entrance (centreline of road for rural sections); (e) the driveway at the foundation line; (f) TFW, FFE, BSE, USF and GFE; (g) swale and ditch centrelines; (h) drainage structures (grate and inverts); (i) trees, sidewalks, poles and other features affected; (j) any other location the authority requires.

12.21.5 Drainage arrows with percent slope; swale details matching the plan; the overland flow route with spill elevations; ponding limits for the 5-year and 100-year events where applicable.

12.21.6 Details under 12.20; roof outline, downspouts and sump discharges; foundation drain outlet and backwater valve (12.15); tree protection zones (12.16); erosion and sediment control (12.17).

12.21.7 The seal of a P.Eng. (or an OLS where the authority accepts one), the completed INEAS Residential Drainage Plan Checklist in the project folder, and space for the authority's approval stamp where required.

12.21.8 Reports: a Stormwater Management Brief where 12.10 applies; a geotechnical investigation where 12.13 applies; an arborist's report where 12.16.2 applies.

12.21.9 Final grading certification: after construction, grades shall be checked against the approved plan and certified on the authority's form, or the INEAS Final Grading Checklist, within the tolerance in Table 12.1, with every out-of-tolerance item explained.

Annex A (informative) — Municipal variations, Eastern Ontario

The criteria below override the INEAS defaults where they apply. They are taken from the municipal publications listed in this Annex, and shall be rechecked against the authority's current document on every project.

Authority

Document (edition)

Key site engineering criteria

City of Brockville

Residential Lot Grading and Drainage Requirements (posted Mar 2025); SPC manual

1:200 metric; geodetic benchmark; min 2% surface slope; max 3:1; swales 150 mm deep (200 mm on rear lot lines); max 300 mm ponding; no increase over pre-development; final grading tolerance 50 mm; Tc min 15 min; cite OPSS.MUNI 805 and 180 in notes

City of Kingston

Site Plan Control Guidelines (Feb 2025); CLI-ECA SWM Checklist (V3, May 2023)

Submissions through DASH; existing grades 3 m and 6 m beyond site; post not above pre to 100-year (80% of pre where capacity is limited); Tc min 15 min; City IDF for 5-year, Environment Canada IDF to 100-year; lawn C = 0.25; CRCA consent for CLI-ECA

Cataraqui Conservation

Guidelines for Stormwater Management

Control to the 2-year pre-development rate; LID screening section; ICD and OGS calcs with first submission; 0.3 m pond freeboard

United Counties of Leeds and Grenville

County entrance policy

Drainage memo or study for sites fronting County roads; entrance permit

Township of Leeds and the Thousand Islands

Site Plan Control Guidelines

Pre-consultation mandatory; geodetic datum and Township benchmark; retaining walls over 1.0 m P.Eng.-certified; securities 50% on-site, 100% on municipal land

Municipality of North Grenville

Engineering Standards, Sections A and C (Aug 2022)

600 x 900 mm sheets; post to pre for 5- and 100-year; quality event 25 mm 4-hour or 2-year; LID first; MTO IDF; 100-year HGL 0.3 m below USF; min restrictor 100 mm; inspection MH within 1.5 m of property line (E4.07); live-tap note (D5.05)

City of Cornwall

Site Plan Process Submission Requirements (2016)

1:500 or larger; minor system 5-year; post to pre for 100-year; 70% TSS (urban, larger sites); ditch slopes max 3:1; frost cover 2.0 m

Township of South Stormont

Site Plan & Subdivision Design Guidelines (Sept 2022)

NAD83 geodetic; grading max 1:500 with 3 benchmarks; post to pre for 5/100-year (Cornwall IDF); 70% TSS

United Counties of SDG

Engineering Design Standards (Dec 2023)

Post to pre for 5/100-year; 80% TSS; Rational Method under 5 ha; ponding max 300 mm; 300 mm freeboard

Town of Perth

Engineering Design Guidelines

Minor system to 5-year; 100-year major flow max 300 mm deep; release capped at 5-year pre rate; rooftop storage max 100 mm

Town of Smiths Falls

SPC By-law Appendix A (2021)

Grading plan for new buildings or parking over 4 spaces; spot elevations 5 m onto abutting land; post not above pre; 5/100-year ponding shown; maximize infiltration

City of Ottawa

Sewer Design Guidelines SDG 004 (4th ed., Dec 2025); Grading and Drainage ToR

Existing elevations 10 m into adjacent lands; LID screening per Appendix 10; grassed slopes max 7%; watermain cover 2.4 m; city standard details over OPSD

Town of Hawkesbury

Design Guidelines for Municipal Infrastructure (Rev 2, 2019)

Rational Method with Ottawa IDF, min Tc 10 min; watermain min 150 mm, 2.4 m cover; hydrants max 90 m; storm min 250 mm; no foundation drains to sanitary

MTO

Drainage Management Manual; corridor management

No increase to highway ditch; MTO IDF; per-outlet analysis; no reliance on rooftop storage or orifice plates for flows to MTO; permit control limits plotted

A.2 Local additions

These additions are summaries of municipal publications and shall be checked against the current municipal document.

  • City of Brockville: Site Plan Control Manual. Drawings at least 1:250 unless the City agrees otherwise in writing. Imperial drawings are not accepted. The legend shows zoning, OBC data, landscaped and paved areas in m2 and %. Grading and drainage plans include detention calculations. Pre-consultation is mandatory under By-law 039-2012. The residential application package is 8 collated 24x36 sets, 1 set at 11x17, a PDF, and one paper and one digital copy of each study.

  • Cataraqui Conservation (CRCA): Plan review of site plans and technical reports. Site plan comments test conformity with the subwatershed and master drainage plans. Post-development flow to the 2-year pre-development rate in the Cataraqui watershed. Geotechnical reports for erosion hazard sites use a stable slope allowance of 3H:1V in till (1H:1V in bedrock) plus a 6 m erosion access allowance.

  • City of Kingston: Site Plan Control Guidelines (Feb 2025). Metric drawings with revision blocks. Grading plans show existing grades 3 m and 6 m beyond the site. Submissions only through DASH. By-law 2025-109 applies citywide, with exemptions for lots of 10 or fewer residential units.

  • Township of Augusta: Site plan control area by By-law 2778-2009. Application must show a 15 m shoreline buffer, wells, septic, floodplain and Leda clay. Agreement securities are cash or an irrevocable letter of credit before execution.

  • Township of Edwardsburgh Cardinal: Engineer plans sealed by an Ontario P.Eng. Grading plans show geodetic elevations and pre- and post-development flows where drainage reaches a road. Servicing frost protection is required under 1.5 m of cover. Landscape screening of at least 1.2 m conifers.

  • Town of Gananoque: Development Permit System (By-law 2010-65). One application covers site plan, minor variance and zoning. Classes I to III. Completeness is confirmed within 10 working days. Securities cover 100% of on-site and off-site works.

  • City of Ottawa: Grading and Drainage Plan Terms of Reference. Existing elevations 10 m into adjacent lands. Title block includes a revision box. Flow arrows, ponding limits and overland routes are shown. Servicing study types are Comprehensive, Assessment of Adequacy, Functional, and SWM report or Detailed Design Brief.

  • City of Hamilton: Stormwater Management Report guideline (13 Feb 2026). Ponding limited to 0.25 m in parking lots and 0.30 m in loading bays. Report needs digital model files, catchment shapefiles and a 67-item checklist.

  • City of Brantford: Storm sewer design manual (V7, Feb 2023). Minor system 5-year, major 100-year. Enhanced quality of 80% TSS. Erosion control by 25 mm 4-hour extended detention.

  • Region of Peel: Stormwater design criteria (June 2019). Drainage onto Regional roads is not permitted.

Annex B (informative) — Basis: most-cited requirements and repeat review themes

B.1 Requirements most often published by Ontario municipalities

Count = number of municipal publications reviewed that state the requirement.

Requirement

Count

Clause

Seal, sign and date all engineering drawings and reports

97

4.1.1

Tie elevations to a geodetic benchmark shown on the grading plan

71

4.2.2

Standard metric scale, same across sheets

71

4.2.1

Metric units only

65

4.2.1

Vector, flattened, unlocked PDFs

63

Clause 1.3 (submission format)

SWM report or brief to the municipal terms of reference

61

7.1

Pre-consultation before submission; record attached

56

3.1 (pre-consultation record)

Georeferenced CAD files where required

56

4.2.3

Design to current municipal standards; deviations accepted in writing

55

4.2.3; 4.4.1

Current OLS boundary and topographic survey as base

51

4.2.4

Site or functional servicing report

48

8.1.1

ESC plan sealed by a P.Eng.

40

9.1

Post-development peaks controlled to pre-development or allowable rate

37

7.4.1

B.2 Repeat review themes

The themes below are generalised from recurring review comments on engineering submissions. They drove the clauses shown. No counts or project references are given, and authorities are not named.

Repeat theme

Clause

Report, appendices and drawings inconsistent; missing appendices; template text left in

Clause 0.2; Section 4 (Response matrix)

Criteria not confirmed, or another municipality's thresholds cited instead of the governing ones

4.3, 7.1.2

Storage sized with Tc instead of critical duration; method not stated

7.2.3

C values and Tc method unjustified; areas estimated rather than measured in CAD

7.2.4, 7.2.5

Pre-development impervious area unsupported

7.2.6

No per-outlet table; flow to MTO ditch not separated

7.4.2

ICD and OGS calculations missing or devices not labelled on drawings

7.5.3, 7.8.1

No stage-storage-discharge tables or outlet details

7.8.3

LID used without testing, screening or pre-treatment

7.7

Overland flow route shown only in the report, not on the grading plan

6.5.1

Interim vs ultimate connections not shown where a road reconstruction is planned

4.3.3, 8.7

Inspection manhole, curb stop and isolation valve locations

8.2.4, 8.3.2

Generic cover note instead of local frost cover

8.5.2

Septic records and Part 8 capacity not checked on rural additions

8.6

Conservation authority flood level and regulation limit not plotted

6.3.4, 6.6

No ESC drawing with the SWM brief

9.1, 9.3

Site alteration before SWM acceptance

9.5

Annex D (informative) — Open items for peer review

The following items shall be resolved before this Standard is issued. Reviewers are invited to comment in the Response column. Each item needs a decision by the principal engineer.

No.

Clause

Open item

Response

D1

6.4, Table 6.1

Resolved: minimum paved slope 1.5%

D2

6.4, Table 6.1

Resolved: minimum swale slope 2.0%

D3

6.4, Table 6.1

Resolved: driveway 2% to 10%; authority limit near the ROW governs

D4

6.5.2

Confirm freeboard from 100-year spill elevation to lowest opening (proposed 0.30 m)

D5

7.3.1

Set the climate change stress-test increase for 100-year intensity

D6

7.8.2

Confirm default minimum orifice size (proposed 75 mm)

D7

5

Recheck site plan control law after the outcome of ERO 026-0310 and the 2026 amendments to s. 41

D8

Annex A

Add criteria for Gananoque, Prescott, Elizabethtown-Kitley, Augusta, Rideau Lakes, and RVCA, MVCA and South Nation Conservation as their documents are reviewed

D9

7.14

Confirm every value in Clause 7.14 against SDG 004 (December 2025) and bulletin ISTB-2018-01

D10

12

Check every OBC article number in Clause 12 against the 2024 Compendium

D11

12.13.2

Resolved: soakaway pits and infiltration trenches at least 5 m from foundations (OBC 9.14.5.3)

D12

12.5, Table 12.1

Confirm driveway grade 7% desirable, 10% absolute (INEAS checklist 7%, Table 6.1 10%)

D13

12.5, Table 12.1

Resolved: swale minimum 2.0%; 1.0% only with a subdrain

D14

12.4.2

Confirm: checklist 8 in above grade replaced by OBC 150 mm, and 200 mm to moisture-sensitive cladding

D15

12.9.7

Confirm: checklist geotextile reference corrected from OPSD 1860 to OPSS.MUNI 1860

D16

Table 12.1

Confirm 2:1 only for planted, unmown banks under 0.6 m high

D17

12.11

Confirm landscape wall limit of 0.6 m and the tiered-wall rule

D18

Table 12.1

Confirm driveway transition limit 8% and side-swale maximum depth 300 mm

D19

12.9.7

Confirm subdrain pipe size (100 mm), stone gradation and minimum slope (0.5%)

D20

12.18.3

Confirm well casing height above grade under R.R.O. 1990, Reg. 903

D21

12.10.3

Confirm catch basin lead criteria (250 mm, 2%, 1.0 m from lot line) as an INEAS default or authority-only

D22

12.3.2

Confirm 5 m survey interval along shared lot lines on infill lots

D23

12.8.2, 12.8.3

Confirm 100 mm stairwell curb, and 2% for 1.5 m outside walkouts

D24

12.15.4

Confirm INEAS default: backwater valve on every new dwelling and below-grade unit on municipal sanitary service

D25

12.15.2

Confirm the 2024 OBC Part 7 article for sump covers

D26

12.16.3

Confirm 300 mm minimum topsoil depth in landscaped areas

D27

12.20.2

Create the INEAS standard detail library in CAD Templates

Sources